Matching Items (8)
Filtering by

Clear all filters

Created2011-08
Description

The Arizona Department of Transportation, through the Planning Assistance for Rural Areas (PARA) program, awarded funding for the City of Sierra Vista Safe Bicycle and Pedestrian Routes Plan. Improving bicycle and pedestrian safety has many benefits to the city of Sierra Vista and its residents. Improving and providing safe bicycle

The Arizona Department of Transportation, through the Planning Assistance for Rural Areas (PARA) program, awarded funding for the City of Sierra Vista Safe Bicycle and Pedestrian Routes Plan. Improving bicycle and pedestrian safety has many benefits to the city of Sierra Vista and its residents. Improving and providing safe bicycle and pedestrian facilities provides a viable transportation option for those people who cannot or do not drive. In addition, it is anticipated that development of a network of safe bicycle and pedestrian routes will increase the number of bicycle and pedestrian trips, thus reducing reliance on personal vehicles.

43031-Thumbnail Image.png
Created2011-09-19
Description

This study, and the resulting transportation plan, is funded through ADOT’s Planning Assistance for Rural Areas (PARA) program. ADOT and the Town of Colorado City have retained the consultant team of Wilbur Smith Associates to conduct the study under the oversight and direction of a Technical Advisory Committee (TAC) that

This study, and the resulting transportation plan, is funded through ADOT’s Planning Assistance for Rural Areas (PARA) program. ADOT and the Town of Colorado City have retained the consultant team of Wilbur Smith Associates to conduct the study under the oversight and direction of a Technical Advisory Committee (TAC) that includes members from the Town of Colorado City; adjacent Hildale City, Utah; Mohave County; the Arizona Department of Transportation Multimodal Planning Division; the ADOT Flagstaff District Engineer’s office; and other interested parties.

43635-Thumbnail Image.png
Created2003-08-04
Description

With the advent of multi-modal transportation planning, and given that most of the major metropolitan areas in Arizona have implemented bicycle and pedestrian plans, it is now desirable that ADOT develop a bicycle and pedestrian plan that encompasses all of Arizona. The major intent of the Statewide Bicycle and Pedestrian

With the advent of multi-modal transportation planning, and given that most of the major metropolitan areas in Arizona have implemented bicycle and pedestrian plans, it is now desirable that ADOT develop a bicycle and pedestrian plan that encompasses all of Arizona. The major intent of the Statewide Bicycle and Pedestrian Plan is to provide a long-term plan for a system of shared roadways and bicycle and pedestrian facilities for the ADOT State Highway System. This includes the definition of the roles of the State and local government in the continual development of the bicycle and pedestrian transportation system in Arizona. It also includes the identification of all existing bicycle and pedestrian plans of the MPOs within Arizona to address the relationship between ADOT and the jurisdictions in the advancement of these plans. In addition, this plan includes design and maintenance guidelines for consideration by all implementing agencies in Arizona. Most importantly, this statewide bicycle and pedestrian plan guides ADOT in making transportation decisions impacting bicycling and pedestrian activity, and improves the accommodation of these non-motorized modes of transportation within Arizona’s multi-modal transportation system.

43634-Thumbnail Image.png
Created2004-12
Description

The Statewide Bicycle and Pedestrian Phase II Plan focuses on implementing some of the main recommendations of the Statewide Bicycle and Pedestrian Phase I Plan. This includes the development of documents for statewide distribution, the development of plans for a number of future programs, and significant improvements to the Bicycle

The Statewide Bicycle and Pedestrian Phase II Plan focuses on implementing some of the main recommendations of the Statewide Bicycle and Pedestrian Phase I Plan. This includes the development of documents for statewide distribution, the development of plans for a number of future programs, and significant improvements to the Bicycle and Pedestrian Program website.

43633-Thumbnail Image.png
Created2007-01-30
Description

This document provides a summary of activities completed in support of Phase III of the Arizona Statewide Bicycle and Pedestrian Program. The purpose of Phase III was to implement recommendations from the Arizona Statewide Bicycle and Pedestrian Plan Phase I and Phase II.

43267-Thumbnail Image.png
Created2005-09-07
Description

From May 2005 to June 2005, the Arizona Department of Environmental Quality conducted a study, Potable Well Sampling Task 4.0, to determine if the chromium and chromium VI plume due to the discharge of the Pacific Gas and Electronic Topock Compressor Station has migrated under the Colorado River and impacted

From May 2005 to June 2005, the Arizona Department of Environmental Quality conducted a study, Potable Well Sampling Task 4.0, to determine if the chromium and chromium VI plume due to the discharge of the Pacific Gas and Electronic Topock Compressor Station has migrated under the Colorado River and impacted water supplies in Arizona. The ADEQ investigated the total chromium and hexavalent chromium (chromium VI) concentrations in (1) public water supply wells, (2) combined industrial and domestic water supply wells, and (3) private domestic water supply wells at Topock and Golden Shores, Arizona. The communities of Topock and Golden Shores have expressed their concerns regarding the findings. Thus, the ADEQ requested the Arizona Department of Health Services to evaluate the potential health effects of exposure to well water contaminated with chromium.

42391-Thumbnail Image.png
Created2007-04-30
Description

Grace Neal Parkway and Bank Street are located in the northern Kingman area partially outside of the Kingman city limits. This report discusses of creating a new arterial roadway providing safety and convenience for vehicular traffic and pedestrians. Although Grace Neal is referred to as a parkway, its designation for

Grace Neal Parkway and Bank Street are located in the northern Kingman area partially outside of the Kingman city limits. This report discusses of creating a new arterial roadway providing safety and convenience for vehicular traffic and pedestrians. Although Grace Neal is referred to as a parkway, its designation for design is arterial.

42410-Thumbnail Image.png
Created2009-06
Description

It was decided to revise the 1980 Havasu area study, since the area had changed so much. The members felt that to retain some control over the growth a revised area plan was needed and decided to have the area covered to be just the 72 square miles of the

It was decided to revise the 1980 Havasu area study, since the area had changed so much. The members felt that to retain some control over the growth a revised area plan was needed and decided to have the area covered to be just the 72 square miles of the Desert Hills Fire District, rather than the whole of the unincorporated Lake Havasu Area north of the City.