The Board of Supervisors make an estimate of the different amounts required to meet the public expenditures/expenses for the ensuing year, also an estimate of revenues from sources other than direct taxation, and the amount to be raised by taxation upon real and personal property of Graham County.

42937-Thumbnail Image.png
Created2009-07-31
Description

The Graham County, Safford, Thatcher, Pima Small Area Transportation Study was initiated by Graham County, in conjunction with the Arizona Department of Transportation, to develop a countywide, long-range multimodal transportation plan for this growing rural Arizona community. The project sponsors selected the PB Americas team to conduct this study under

The Graham County, Safford, Thatcher, Pima Small Area Transportation Study was initiated by Graham County, in conjunction with the Arizona Department of Transportation, to develop a countywide, long-range multimodal transportation plan for this growing rural Arizona community. The project sponsors selected the PB Americas team to conduct this study under the direction of a Technical Advisory Committee, which included representatives from Graham County, City of Safford, Town of Thatcher, Town of Pima, Southeastern Arizona Governments Organization, and ADOT.

42938-Thumbnail Image.png
Created1998-12
Description

In 1992, Graham County conducted a transportation study for the Gila Valley Region. This study prepared a long-range transportation plan and a transportation improvement program. Many of the improvements have been completed. The purpose of this study is to update the 1992 transportation plan and to address the current issues

In 1992, Graham County conducted a transportation study for the Gila Valley Region. This study prepared a long-range transportation plan and a transportation improvement program. Many of the improvements have been completed. The purpose of this study is to update the 1992 transportation plan and to address the current issues within the area.

42319-Thumbnail Image.png
Created1999-06
Description

This study was developed to identify the resources and applicable methodology for the delineation of primary flood corridors.

42322-Thumbnail Image.png
Created1999-11-30
Description

The purpose of the Phase I study is to evaluate existing drainage conditions and to identify alternative flood control/floodplain management strategies which warrant further consideration.

42328-Thumbnail Image.png
Created1996-09-06
Description

Originally, the purpose of the study was to obtain either a Letter of Map Revision or a Physical Map Revision from the Federal Emergency Management Agency. Unfortunately, during the initial stages of the investigation, it became apparent that FEMA's guidelines for these types of map revisions could not be accommodated,

Originally, the purpose of the study was to obtain either a Letter of Map Revision or a Physical Map Revision from the Federal Emergency Management Agency. Unfortunately, during the initial stages of the investigation, it became apparent that FEMA's guidelines for these types of map revisions could not be accommodated, primarily due to flow-distribution conflicts.

42341-Thumbnail Image.png
Created1992-08
Description

This report describes the hydrologic and hydraulic analysis. Development in the lower end of the watershed has occurred without knowledge of the floodplain's characteristics.

42349-Thumbnail Image.png
Created1989 to 1991
Description

The purpose of the study is to identify existing flooding problems for fifteen homes adjacent and west of Holladay Street which have experienced flooding in the past three years. A 1991 follow-up report is included that corrects an error in the earlier report's estimation of the split flow quantities at

The purpose of the study is to identify existing flooding problems for fifteen homes adjacent and west of Holladay Street which have experienced flooding in the past three years. A 1991 follow-up report is included that corrects an error in the earlier report's estimation of the split flow quantities at the intersection.

42360-Thumbnail Image.png
Created1986-03-15
Description

This report is the first phase of a study to provide a basin management plan for the Tucson Mountain Drainage Basin. Phase II will identify and evaluate alternative specific solutions to flood plain management measures with Phase III accomplishing conceptual designs for the selected alternatives.

42363-Thumbnail Image.png
Created2009-01-21
Description

Covers an area in southeastern Pima County that drains the Arivaca Creek watershed. The purpose of the report is to estimate peak discharge for the 50 year storm frequency event, utilizing the rational method (Q=CiA). This method pre-dates that outlined in the Hydrology Manual for Engineering Design and Floodplain Management

Covers an area in southeastern Pima County that drains the Arivaca Creek watershed. The purpose of the report is to estimate peak discharge for the 50 year storm frequency event, utilizing the rational method (Q=CiA). This method pre-dates that outlined in the Hydrology Manual for Engineering Design and Floodplain Management within Pima County, Sept. 1979, and is considered less accurate. It is recommended that this report be archived and discontinued for use for regulatory purposes.