Matching Items (12)
Filtering by

Clear all filters

118014-Thumbnail Image.png
Created2010-10
Description

A comprehensive research program for the characterization of storm water runoff from an Arizona highway was conducted from January through December 2007. The study area covered a portion of the Loop 202 freeway west of Mesa Drive to a retention basin east of Lindsay Road in Mesa, Arizona. Storm water

A comprehensive research program for the characterization of storm water runoff from an Arizona highway was conducted from January through December 2007. The study area covered a portion of the Loop 202 freeway west of Mesa Drive to a retention basin east of Lindsay Road in Mesa, Arizona. Storm water samples were collected from two storm water detention basins and a discharge point to the Salt River. The study was conducted by manually collecting storm water samples with passive automatic samplers and analyzing them for various roadway constituents. A primary objective of this research effort was to establish baseline values of constituents in ADOT highway runoff, aiding in the evaluation of related best management practices. A total of 16 storm water samples was collected from the research area between January 2007 and December 2007.

42319-Thumbnail Image.png
Created1999-06
Description

This study was developed to identify the resources and applicable methodology for the delineation of primary flood corridors.

42322-Thumbnail Image.png
Created1999-11-30
Description

The purpose of the Phase I study is to evaluate existing drainage conditions and to identify alternative flood control/floodplain management strategies which warrant further consideration.

42328-Thumbnail Image.png
Created1996-09-06
Description

Originally, the purpose of the study was to obtain either a Letter of Map Revision or a Physical Map Revision from the Federal Emergency Management Agency. Unfortunately, during the initial stages of the investigation, it became apparent that FEMA's guidelines for these types of map revisions could not be accommodated,

Originally, the purpose of the study was to obtain either a Letter of Map Revision or a Physical Map Revision from the Federal Emergency Management Agency. Unfortunately, during the initial stages of the investigation, it became apparent that FEMA's guidelines for these types of map revisions could not be accommodated, primarily due to flow-distribution conflicts.

42341-Thumbnail Image.png
Created1992-08
Description

This report describes the hydrologic and hydraulic analysis. Development in the lower end of the watershed has occurred without knowledge of the floodplain's characteristics.

42349-Thumbnail Image.png
Created1989 to 1991
Description

The purpose of the study is to identify existing flooding problems for fifteen homes adjacent and west of Holladay Street which have experienced flooding in the past three years. A 1991 follow-up report is included that corrects an error in the earlier report's estimation of the split flow quantities at

The purpose of the study is to identify existing flooding problems for fifteen homes adjacent and west of Holladay Street which have experienced flooding in the past three years. A 1991 follow-up report is included that corrects an error in the earlier report's estimation of the split flow quantities at the intersection.

42360-Thumbnail Image.png
Created1986-03-15
Description

This report is the first phase of a study to provide a basin management plan for the Tucson Mountain Drainage Basin. Phase II will identify and evaluate alternative specific solutions to flood plain management measures with Phase III accomplishing conceptual designs for the selected alternatives.

42363-Thumbnail Image.png
Created2009-01-21
Description

Covers an area in southeastern Pima County that drains the Arivaca Creek watershed. The purpose of the report is to estimate peak discharge for the 50 year storm frequency event, utilizing the rational method (Q=CiA). This method pre-dates that outlined in the Hydrology Manual for Engineering Design and Floodplain Management

Covers an area in southeastern Pima County that drains the Arivaca Creek watershed. The purpose of the report is to estimate peak discharge for the 50 year storm frequency event, utilizing the rational method (Q=CiA). This method pre-dates that outlined in the Hydrology Manual for Engineering Design and Floodplain Management within Pima County, Sept. 1979, and is considered less accurate. It is recommended that this report be archived and discontinued for use for regulatory purposes.

Created2005 to 2007
Description

In September 2004, ADOT awarded a contract for the Pinal County Corridors Definition Study to Kimley-Horn and Associates. The scope of the Pinal County Corridors Definition Study included the following activities:
* Confirm the need for the East Valley and the North-South corridors;
* Define planning-level corridor definition alternatives;
* Perform a technical

In September 2004, ADOT awarded a contract for the Pinal County Corridors Definition Study to Kimley-Horn and Associates. The scope of the Pinal County Corridors Definition Study included the following activities:
* Confirm the need for the East Valley and the North-South corridors;
* Define planning-level corridor definition alternatives;
* Perform a technical assessment of engineering, environmental, and land use compatibility constraints opportunities for the planning-level corridor definition alternatives;
* Identify to the extent possible, feasible and preferred planning-level corridor definitions on the basis of the technical evaluation;
* Document planning-level costs of corridor development (including studies, design, construction, and right-of-way costs) for the preferred corridor definitions.

The Pinal County Corridors Definition Study resulted in sufficient detail to provide a basis for the future establishment of geometric roadway alignments and corridor design concepts, the preservation of right-of-way, and the identification of required environmental clearance studies.