Matching Items (12)
Filtering by

Clear all filters

Created2010-06
Description

The La Paz Transportation Planning Study was conducted as part of the Planning Assistance for Rural Areas program sponsored by the Arizona Department of Transportation Multimodal Planning Division. This Study developed 5, 10, and 20-year transportation plans, as well as an implementation program, to guide the County, Towns, and the

The La Paz Transportation Planning Study was conducted as part of the Planning Assistance for Rural Areas program sponsored by the Arizona Department of Transportation Multimodal Planning Division. This Study developed 5, 10, and 20-year transportation plans, as well as an implementation program, to guide the County, Towns, and the Colorado River Indian Tribes in meeting transportation needs for the Study Area into the future.

Created2011-02
Description

ADOT, in cooperation with the City of Kingman and Mohave County, initiated the Kingman Area Transportation Study Update to update the 2005 Kingman Area Transportation Study. The study provides a plan of improvements for 5-year (short-range), 10-year (mid-range), and 20-year (long-range) transportation planning horizons. The recommendations are multimodal, considering roadways,

ADOT, in cooperation with the City of Kingman and Mohave County, initiated the Kingman Area Transportation Study Update to update the 2005 Kingman Area Transportation Study. The study provides a plan of improvements for 5-year (short-range), 10-year (mid-range), and 20-year (long-range) transportation planning horizons. The recommendations are multimodal, considering roadways, nonmotorized transportation modes (bicycles and pedestrians), and transit components.

42925-Thumbnail Image.png
Created2013-09
Description

In fiscal year 2011, Kingman Unified School District’s student achievement was similar to peer district averages, and it operated efficiently with lower costs than peer districts’, on average. The District operated its administration with lower per pupil costs because it employed fewer administrative staff per pupil than peer districts, on

In fiscal year 2011, Kingman Unified School District’s student achievement was similar to peer district averages, and it operated efficiently with lower costs than peer districts’, on average. The District operated its administration with lower per pupil costs because it employed fewer administrative staff per pupil than peer districts, on average. In addition, the District’s plant operations cost per square foot and food service cost per meal were lower than peer districts’ averages. The District’s transportation program cost per pupil was higher than the peer districts’ average, but the program was efficient, with lower per mile costs. However, the District should improve some of its administrative practices. In particular, the District should strengthen controls over its cash handling, culinary arts program, and computer network and systems.

42391-Thumbnail Image.png
Created2007-04-30
Description

Grace Neal Parkway and Bank Street are located in the northern Kingman area partially outside of the Kingman city limits. This report discusses of creating a new arterial roadway providing safety and convenience for vehicular traffic and pedestrians. Although Grace Neal is referred to as a parkway, its designation for

Grace Neal Parkway and Bank Street are located in the northern Kingman area partially outside of the Kingman city limits. This report discusses of creating a new arterial roadway providing safety and convenience for vehicular traffic and pedestrians. Although Grace Neal is referred to as a parkway, its designation for design is arterial.

42363-Thumbnail Image.png
Created2009-01-21
Description

Covers an area in southeastern Pima County that drains the Arivaca Creek watershed. The purpose of the report is to estimate peak discharge for the 50 year storm frequency event, utilizing the rational method (Q=CiA). This method pre-dates that outlined in the Hydrology Manual for Engineering Design and Floodplain Management

Covers an area in southeastern Pima County that drains the Arivaca Creek watershed. The purpose of the report is to estimate peak discharge for the 50 year storm frequency event, utilizing the rational method (Q=CiA). This method pre-dates that outlined in the Hydrology Manual for Engineering Design and Floodplain Management within Pima County, Sept. 1979, and is considered less accurate. It is recommended that this report be archived and discontinued for use for regulatory purposes.

42356-Thumbnail Image.png
Created1988-06-17
Description

Millstone Manor #6 is a subdivision that was recorded in the mid-1950's. All records indicate no engineering took place with regards to potential for drainage improvements. This report will address what the natural floodprone areas are and will recommend how future permits should be processed.

42349-Thumbnail Image.png
Created1989 to 1991
Description

The purpose of the study is to identify existing flooding problems for fifteen homes adjacent and west of Holladay Street which have experienced flooding in the past three years. A 1991 follow-up report is included that corrects an error in the earlier report's estimation of the split flow quantities at

The purpose of the study is to identify existing flooding problems for fifteen homes adjacent and west of Holladay Street which have experienced flooding in the past three years. A 1991 follow-up report is included that corrects an error in the earlier report's estimation of the split flow quantities at the intersection.

42347-Thumbnail Image.png
Created1990-09-12
Description

The purpose of this report is to assist the Pima County Board of Supervisors in assessing whether the Black Wash area requires area-specific flood control policies.

42345-Thumbnail Image.png
Created1992-01
Description

This study proposes to reduce flood damages from both Tanque Verde Creek and offsite flows, as they affect the Fortyniner's Country Club Estates and the Arbor Vista subdivisions.

42330-Thumbnail Image.png
Created1987 to 1989
Description

Offsite drainage impacts the project site from several watersheds whose headwaters lie to the northeast of the project site. This report will address the manner in which the existing offsite and the post-development onsite drainage will be conveyed across this project.