Matching Items (13)
Filtering by

Clear all filters

Created2005 to 2007
Description

In September 2004, ADOT awarded a contract for the Pinal County Corridors Definition Study to Kimley-Horn and Associates. The scope of the Pinal County Corridors Definition Study included the following activities:
* Confirm the need for the East Valley and the North-South corridors;
* Define planning-level corridor definition alternatives;
* Perform a technical

In September 2004, ADOT awarded a contract for the Pinal County Corridors Definition Study to Kimley-Horn and Associates. The scope of the Pinal County Corridors Definition Study included the following activities:
* Confirm the need for the East Valley and the North-South corridors;
* Define planning-level corridor definition alternatives;
* Perform a technical assessment of engineering, environmental, and land use compatibility constraints opportunities for the planning-level corridor definition alternatives;
* Identify to the extent possible, feasible and preferred planning-level corridor definitions on the basis of the technical evaluation;
* Document planning-level costs of corridor development (including studies, design, construction, and right-of-way costs) for the preferred corridor definitions.

The Pinal County Corridors Definition Study resulted in sufficient detail to provide a basis for the future establishment of geometric roadway alignments and corridor design concepts, the preservation of right-of-way, and the identification of required environmental clearance studies.

43188-Thumbnail Image.png
Created2005-06
Description

This report describes the development of base and future socioeconomic estimates for the Pinal Corridor Planning Model, developed by ADOT to support the evaluation of potential new highway corridors in Northern Pinal County. This section presents a summary of the methodology, data sources used, and historical trends in population and

This report describes the development of base and future socioeconomic estimates for the Pinal Corridor Planning Model, developed by ADOT to support the evaluation of potential new highway corridors in Northern Pinal County. This section presents a summary of the methodology, data sources used, and historical trends in population and employment growth. The following two sections present the base and future year methods and resulting estimates of population and employment.

42845-Thumbnail Image.png
Created2013-10
Description

The proposed Meridian Road Corridor Study is needed to support the continuing development and growth, occurring and anticipated, in the East Mesa, West Apache Junction, and within Pinal County. The purpose of the Meridian Road Corridor Study is to document conditions along the existing roadway and to develop alternatives that

The proposed Meridian Road Corridor Study is needed to support the continuing development and growth, occurring and anticipated, in the East Mesa, West Apache Junction, and within Pinal County. The purpose of the Meridian Road Corridor Study is to document conditions along the existing roadway and to develop alternatives that will increase the safety and future level of service of Meridian Road. This study will also establish a roadway footprint and develop the ultimate right‐of‐way requirement for the corridor. Finally, the study will be utilized as a guide for local agencies and future development along the corridor. The study area for the Meridian Road Corridor Study is approximately 13 miles in length.

42805-Thumbnail Image.png
Created2013-04
Description

This report and the accompanying Geographic Information System (GIS) datasets summarize the results of the workshop held in Florence, Arizona in 2010. At this workshop, stakeholders representing a broad range of organizations and interests identified and mapped the locations of important wildlife linkages across Pinal County. This report provides background

This report and the accompanying Geographic Information System (GIS) datasets summarize the results of the workshop held in Florence, Arizona in 2010. At this workshop, stakeholders representing a broad range of organizations and interests identified and mapped the locations of important wildlife linkages across Pinal County. This report provides background information on the importance and benefits of conserving wildlife linkages for both people and wildlife in Pinal County and describes the methods used during stakeholder workshops and in developing the accompanying GIS products. It includes a series of maps generated from the digitized stakeholder data that depict the general locations of wildlife linkages and potential barriers to wildlife movement within Pinal County. The maps are followed by tables with descriptive information about the habitat areas each linkage connects, the species each linkage serves, and known threats and potential conservation opportunities associated with each linkage.

42801-Thumbnail Image.png
Created2006-06-23
Description

Given the inevitable transportation changes associated with impending growth in Pinal County, there was a need for a method to assess how corresponding emissions changes might affect PM10 and Ozone concentrations in the county and at the monitor sites. The overall objective of the project was to develop methods or

Given the inevitable transportation changes associated with impending growth in Pinal County, there was a need for a method to assess how corresponding emissions changes might affect PM10 and Ozone concentrations in the county and at the monitor sites. The overall objective of the project was to develop methods or models that could be used in Pinal County to adequately address air pollution issues in the County.

42363-Thumbnail Image.png
Created2009-01-21
Description

Covers an area in southeastern Pima County that drains the Arivaca Creek watershed. The purpose of the report is to estimate peak discharge for the 50 year storm frequency event, utilizing the rational method (Q=CiA). This method pre-dates that outlined in the Hydrology Manual for Engineering Design and Floodplain Management

Covers an area in southeastern Pima County that drains the Arivaca Creek watershed. The purpose of the report is to estimate peak discharge for the 50 year storm frequency event, utilizing the rational method (Q=CiA). This method pre-dates that outlined in the Hydrology Manual for Engineering Design and Floodplain Management within Pima County, Sept. 1979, and is considered less accurate. It is recommended that this report be archived and discontinued for use for regulatory purposes.

42356-Thumbnail Image.png
Created1988-06-17
Description

Millstone Manor #6 is a subdivision that was recorded in the mid-1950's. All records indicate no engineering took place with regards to potential for drainage improvements. This report will address what the natural floodprone areas are and will recommend how future permits should be processed.

42349-Thumbnail Image.png
Created1989 to 1991
Description

The purpose of the study is to identify existing flooding problems for fifteen homes adjacent and west of Holladay Street which have experienced flooding in the past three years. A 1991 follow-up report is included that corrects an error in the earlier report's estimation of the split flow quantities at

The purpose of the study is to identify existing flooding problems for fifteen homes adjacent and west of Holladay Street which have experienced flooding in the past three years. A 1991 follow-up report is included that corrects an error in the earlier report's estimation of the split flow quantities at the intersection.

42347-Thumbnail Image.png
Created1990-09-12
Description

The purpose of this report is to assist the Pima County Board of Supervisors in assessing whether the Black Wash area requires area-specific flood control policies.

42345-Thumbnail Image.png
Created1992-01
Description

This study proposes to reduce flood damages from both Tanque Verde Creek and offsite flows, as they affect the Fortyniner's Country Club Estates and the Arbor Vista subdivisions.