Matching Items (6)
Filtering by

Clear all filters

Created2011-06
Description

The primary purpose of this study is to determine what transportation improvements would be needed to accommodate future growth and development of the Raytheon Missile Systems facility located south of Tucson International Airport on Hermans Road. A secondary purpose of this study is to consider longer-term roadway and transit improvements

The primary purpose of this study is to determine what transportation improvements would be needed to accommodate future growth and development of the Raytheon Missile Systems facility located south of Tucson International Airport on Hermans Road. A secondary purpose of this study is to consider longer-term roadway and transit improvements that will improve access to Tucson International Airport and associated airport property planned for future development. Specifically, the study analyzed the effects of closing Hughes Access Road/Alvernon Way to non-Raytheon traffic and recommends alternative roadway improvements that would be needed to accommodate this closure.

Created2014-03-14
Description

The Arizona Department of Transportation, in coordination with Apache County District II and the Fort Defiance Chapter of the Navajo Nation, analyzed the traffic circulation conditions of Navajo Routes 7, 12, 54, 110, and 112 within the Fort Defiance Industrial Area which is designated as a major growth area on

The Arizona Department of Transportation, in coordination with Apache County District II and the Fort Defiance Chapter of the Navajo Nation, analyzed the traffic circulation conditions of Navajo Routes 7, 12, 54, 110, and 112 within the Fort Defiance Industrial Area which is designated as a major growth area on the Navajo Nation. The study was funded by the Federal Highway Administration’s State Planning and Research Program and administered through ADOT’s Multimodal Planning Division's Planning Assistance for Rural Areas (PARA) program. The study was initiated to develop a planning strategy to improve the mobility and safety within the Fort Defiance Industrial Area.

Created2005 to 2007
Description

In September 2004, ADOT awarded a contract for the Pinal County Corridors Definition Study to Kimley-Horn and Associates. The scope of the Pinal County Corridors Definition Study included the following activities:
* Confirm the need for the East Valley and the North-South corridors;
* Define planning-level corridor definition alternatives;
* Perform a technical

In September 2004, ADOT awarded a contract for the Pinal County Corridors Definition Study to Kimley-Horn and Associates. The scope of the Pinal County Corridors Definition Study included the following activities:
* Confirm the need for the East Valley and the North-South corridors;
* Define planning-level corridor definition alternatives;
* Perform a technical assessment of engineering, environmental, and land use compatibility constraints opportunities for the planning-level corridor definition alternatives;
* Identify to the extent possible, feasible and preferred planning-level corridor definitions on the basis of the technical evaluation;
* Document planning-level costs of corridor development (including studies, design, construction, and right-of-way costs) for the preferred corridor definitions.

The Pinal County Corridors Definition Study resulted in sufficient detail to provide a basis for the future establishment of geometric roadway alignments and corridor design concepts, the preservation of right-of-way, and the identification of required environmental clearance studies.

42617-Thumbnail Image.jpg
Created2001-10
Description

In order to work effectively, concurrency requirements and level of service standards mus be an integral part of long term planning and the development review process. To create incentives for density, affordable housing, and mixed use development, staff will propose the application of lower level of service standards for land

In order to work effectively, concurrency requirements and level of service standards mus be an integral part of long term planning and the development review process. To create incentives for density, affordable housing, and mixed use development, staff will propose the application of lower level of service standards for land use types appropriate to certain growth areas.

42619-Thumbnail Image.jpg
Created2001-10
Description

Provides background information relevant to the Circulation Element of the draft Comprehensive Land Use Plan. It describes historic traffic volumes for roads within the various subregional planning areas of Pima County, and compare Pima County trends to national data in areas such as vehicle ownership, travel time, vehicle miles traveled,

Provides background information relevant to the Circulation Element of the draft Comprehensive Land Use Plan. It describes historic traffic volumes for roads within the various subregional planning areas of Pima County, and compare Pima County trends to national data in areas such as vehicle ownership, travel time, vehicle miles traveled, work trip modes of travel, registration, and vehicle costs.

42631-Thumbnail Image.jpg
Created2001-09
Description

Provides insights on historical and current issues in transportation planning. The first section describes the last five decades of planning efforts, funding initiatives and the increasing use of the roadway system. The second section is a series of fact sheets and maps of each subregion that presents the extent of

Provides insights on historical and current issues in transportation planning. The first section describes the last five decades of planning efforts, funding initiatives and the increasing use of the roadway system. The second section is a series of fact sheets and maps of each subregion that presents the extent of the roadways, traffic volumes on major streets, transit and bicycle facility availability, future planned improvements, issues within the subregion, an overlay of the draft biological reserve, and in the northwest, a further overlay of pygmy-owl habitat with a detailed analysis of bond projects.