Matching Items (15)
Filtering by

Clear all filters

ContributorsValley Metro Rail (Author)
Created2009 to 2016
Description

METRO's management is responsible for establishing and maintaining an internal control structure designed to ensure that the assets of METRO are protected from loss, theft, or misuse and to ensure that adequate accounting data are compiled to allow for the preparation of financial statements.

ContributorsValley Metro Rail (Author)
Created2009 to 2016
Description

The Operating and Capital Budget is prepared with the goal of delivering a fiscally prudent, balanced budget. A Five-Year Capital and Operating Program identifies anticipated capital projects, their anticipated capital and operating costs, and funding sources.

42454-Thumbnail Image.png
ContributorsValley Metro Rail (Contributor)
Created2010-04
Description

The development of a Life Cycle program began for each of the three major transportation elements identified within the Regional Transportation Plan. The RPTA is responsible for preparation of the transit component of the Life Cycle program, and METRO has been further delegated the responsibility to prepare the high capacity

The development of a Life Cycle program began for each of the three major transportation elements identified within the Regional Transportation Plan. The RPTA is responsible for preparation of the transit component of the Life Cycle program, and METRO has been further delegated the responsibility to prepare the high capacity transit/light rail transit element.

ContributorsValley Metro Rail (Author)
Created2004 to 2009
Description

METRO is the brand name for Valley Metro Rail Inc., a nonprofit, public corporation charged with the design, construction and operation of the region’s 57-mile high-capacity transit system. Member cities each have a representative on the METRO Board of Directors which establishes overall policies and provides general oversight of the

METRO is the brand name for Valley Metro Rail Inc., a nonprofit, public corporation charged with the design, construction and operation of the region’s 57-mile high-capacity transit system. Member cities each have a representative on the METRO Board of Directors which establishes overall policies and provides general oversight of the agency and its responsibilities.

42843-Thumbnail Image.png
Created2007
Description

The purpose of this document is to provide guidance and detail on implementation of the Flood Control District of Maricopa County Floodplain Regulations and the Maricopa County Drainage Regulations. It presents the County/District philosophy on drainage and floodplain management, and planning for drainage facilities. It contains descriptions of federal, state

The purpose of this document is to provide guidance and detail on implementation of the Flood Control District of Maricopa County Floodplain Regulations and the Maricopa County Drainage Regulations. It presents the County/District philosophy on drainage and floodplain management, and planning for drainage facilities. It contains descriptions of federal, state and county regulations pertaining to such facilities, including links to the various District and County regulations that can be found on the Internet. Most importantly, the policies and minimum standards for implementing the regulations are presented. These policies and standards are based on flood and erosion hazard mitigation strategies that are intended to reduce or eliminate cumulative impacts resulting from development and to enhance public safety.

42852-Thumbnail Image.png
Created2009
Description

The 2009 Comprehensive Floodplain Management Plan and Program is intended to be used as a general guide for future decision-making in District activities. The Plan aims to present adequate background information to aid District staff in prioritizing areas for future studies and projects. The Plan identifies historic flooding events, reviews

The 2009 Comprehensive Floodplain Management Plan and Program is intended to be used as a general guide for future decision-making in District activities. The Plan aims to present adequate background information to aid District staff in prioritizing areas for future studies and projects. The Plan identifies historic flooding events, reviews the District's efforts to solve flooding problems, and formulates five-year plans to reduce flooding through flood control project construction, floodplain identification, and planning programs throughout the county.

42853-Thumbnail Image.png
Created2005-11-02
Description

A report shall be prepared at least every five years beginning in 1985 and shall indicate the past efforts of the district in eliminating or minimizing flood control problems and state the planned future work of the district to eliminate or minimize flood control problems.

Created1992 to 2017
Description

This network operates in the National Weather Service ALERT (Automated Local Evaluation in Real Time) format and is commonly referred to as an ALERT system, which uses automatic telemetry gages for data collection.

Created1992 to 2015
Description

Each report covers a specific storm.