Filtering by
- All Subjects: Watershed management
- All Subjects: Tempe (Ariz.)
- Creators: Battelle Memorial Institute. Technology Partnership Practice
Phase IIA focuses on identifying alternatives for mitigating the hazards and problems, evaluating the alternatives for flood mitigation potential and cost effectiveness, and recommending a preferred alternative and flood control policy.
Concerns research into the origin of water sustaining the Bingham Cienega. For purposes of long term management, we need to understand what the source of water is for the various riparian areas.
Provides basic information about the source of surface water in Cienega Creek at the downstream end of the natural preserve, which will contribute to efforts to conceptualize and implement effective land management proposals for the SDCP. Study results indicate that the surface flow or subflow from Agua Verde Creek do not significantly influence the water in the Cienega Creek.
A community assessment of Tempe by its Police and Fire Departments, to identify significant trends in population demographics and economic development, as well as growth of Arizona State University. These trends are analyzed so that more informed decisions on public safety staffing needs can be made.
An update to the January 2014 community assessment of Tempe by its Police and Fire Departments, reviewing current and planned developments in Tempe and on the ASU Tempe campus that affect public safety needs and response.
Scottsdale Road and Rural Road are identified in the Regional Transportation Plan as an arterial Bus Rapid Transit route. The portion of this route within Scottsdale is programmed and funded in the Transit Life Cycle Program.
The purpose of this study is to develop a basin management plan for Highlands Wash and the two washes west of Highlands Wash.
The purpose of Phase I of the Riverside Terrace Basin management plan is the assessment of the existing hydrologic and basic hydraulic properties of the watershed.
The purpose of this study, which represents Phase I, is to determine long range planning and land use policies for flood control and floodplain management in the southwest area.
The study developed the 100-year floodplain limits within the watershed and identified the area between Westover Avenue and Valencia Road as a major flood hazard area affecting most of the properties along the channel.