Matching Items (54)
Filtering by

Clear all filters

Created2006 to 2008
Description

The Project is responsible for the design and construction of a 19.6 mile, double track system. These reports offer a month-by-month progress report.

ContributorsValley Metro Rail (Author)
Created2009 to 2016
Description

METRO's management is responsible for establishing and maintaining an internal control structure designed to ensure that the assets of METRO are protected from loss, theft, or misuse and to ensure that adequate accounting data are compiled to allow for the preparation of financial statements.

42452-Thumbnail Image.png
Created2008
Description

Recognizing that public art is an integral element to the success of the system, METRO was proud to incorporate artists in the design process from the very start. The public art that resulted from this process is a celebration of place and community. Each station boasts its own unique character

Recognizing that public art is an integral element to the success of the system, METRO was proud to incorporate artists in the design process from the very start. The public art that resulted from this process is a celebration of place and community. Each station boasts its own unique character with artwork that strives to add substance, style and even a touch of whimsy to the transit experience.

42259-Thumbnail Image.png
Created2013-11-25
Description

The objective of this Technical Data Notebook is to provide 100-yr peak discharges at a Concentration Point for the Unnamed 02 and 03 Washes, 100-yr floodplain boundary and erosion hazard information, using the most up-to-date topographic, hydrologic, and hydraulic data. This is a local study and has not been submitted

The objective of this Technical Data Notebook is to provide 100-yr peak discharges at a Concentration Point for the Unnamed 02 and 03 Washes, 100-yr floodplain boundary and erosion hazard information, using the most up-to-date topographic, hydrologic, and hydraulic data. This is a local study and has not been submitted to FEMA.

42270-Thumbnail Image.png
Created2014-05
Description

Eight years into project delivery, the Regional Transportation Authority has completed more than 560 of the multi-modal projects spelled out in the 20-year RTA plan. One of the plan's signature projects, the Tucson streetcar, is set to start passenger service in summer 2014.

Created2007 to 2017
Description

The 20-year transportation plan includes roadway, transit, safety, and environmental and economic vitality elements to help meet the region's transportation goals of improving our safety and cross-town mobility, while reducing traffic congestion.

42282-Thumbnail Image.png
Created2012-11-29
Description

The objective of this Technical Data Notebook is to provide 100-yr peak discharges at Concentration Points for the Unnamed Wash 12, 100-yr floodplain boundary and erosion hazard information, using the most up-to-date topographic, hydrologic, and hydraulic data.

42283-Thumbnail Image.png
Created2012-11-29
Description

This Technical Data notebook has been prepared to study a portion of the Pegler Wash located in Pima County, Arizona. The objective of the TDN is provide regulatory discharge rates and floodplain limits along the Pegler Wash using better topographic, hydrologic, and hydraulic data.

42284-Thumbnail Image.png
Created2010-10-15
Description

This Technical Data Notebook has been prepared in support of a Letter of Map Revision submittal to amend the 100-year floodplain, or Special Flood Hazard Area associated with Finger Rock Wash in Pima County, Arizona. The purpose of this LOMR application is to revise the effective Flood Insurance Rate Ma

This Technical Data Notebook has been prepared in support of a Letter of Map Revision submittal to amend the 100-year floodplain, or Special Flood Hazard Area associated with Finger Rock Wash in Pima County, Arizona. The purpose of this LOMR application is to revise the effective Flood Insurance Rate Map SFHA boundaries based on updated and more detailed information. No new hydraulic structures are present within the study limits.