Matching Items (21)
Filtering by

Clear all filters

Created1995-03-24
Description

A detailed hydraulic analysis of Idle Hour Wash for the purpose of preparing a Letter of Map Revision.

Created1996 to 2006
Description

The objectives of this report are to document the on-site and off-site hydrologic and hydraulic assessment of the site and its characteristics, quantifying existing conditions peak discharges, and define the limits of 100-year on-site floodplains.

Created1994-04-29
Description

Phase IIA focuses on identifying alternatives for mitigating the hazards and problems, evaluating the alternatives for flood mitigation potential and cost effectiveness, and recommending a preferred alternative and flood control policy.

42727-Thumbnail Image.png
Created2001-02
Description

Concerns research into the origin of water sustaining the Bingham Cienega. For purposes of long term management, we need to understand what the source of water is for the various riparian areas.

42723-Thumbnail Image.png
Created2001-05
Description

Provides basic information about the source of surface water in Cienega Creek at the downstream end of the natural preserve, which will contribute to efforts to conceptualize and implement effective land management proposals for the SDCP. Study results indicate that the surface flow or subflow from Agua Verde Creek do

Provides basic information about the source of surface water in Cienega Creek at the downstream end of the natural preserve, which will contribute to efforts to conceptualize and implement effective land management proposals for the SDCP. Study results indicate that the surface flow or subflow from Agua Verde Creek do not significantly influence the water in the Cienega Creek.

42359-Thumbnail Image.png
Created1986-07
Description

The purpose of this study is to develop a basin management plan for Highlands Wash and the two washes west of Highlands Wash.

42358-Thumbnail Image.png
Created1986-11-17
Description

The purpose of Phase I of the Riverside Terrace Basin management plan is the assessment of the existing hydrologic and basic hydraulic properties of the watershed.

42357-Thumbnail Image.png
Created1988-02-04
Description

This report is being submitted for the purpose of reducing the erosion setback limits. The information contained herein supports the claim that a safe reduction in the setback distance can occur.

42356-Thumbnail Image.png
Created1988-06-17
Description

Millstone Manor #6 is a subdivision that was recorded in the mid-1950's. All records indicate no engineering took place with regards to potential for drainage improvements. This report will address what the natural floodprone areas are and will recommend how future permits should be processed.

Created1990-07
Description

The purpose of this study, which represents Phase I, is to determine long range planning and land use policies for flood control and floodplain management in the southwest area.