Filtering by
- All Subjects: Hydrology
- All Subjects: Bridge Canyon Dam (Ariz.)
- Creators: Battelle Memorial Institute. Technology Partnership Practice
- Creators: Archives and Special Collections, Arizona State University Libraries
A detailed hydraulic analysis of Idle Hour Wash for the purpose of preparing a Letter of Map Revision.
The objectives of this report are to document the on-site and off-site hydrologic and hydraulic assessment of the site and its characteristics, quantifying existing conditions peak discharges, and define the limits of 100-year on-site floodplains.
S75: A bill authorizing the construction, operation and maintenance of a dam and incidental works in the main stream of the Colorado River at Bridge Canyon, together with certain appurtenant dams and canals, 3/12/1951.
Bridge Canyon Project Report to accompany S75.
This report is being submitted for the purpose of reducing the erosion setback limits. The information contained herein supports the claim that a safe reduction in the setback distance can occur.
Millstone Manor #6 is a subdivision that was recorded in the mid-1950's. All records indicate no engineering took place with regards to potential for drainage improvements. This report will address what the natural floodprone areas are and will recommend how future permits should be processed.