Matching Items (18)
Filtering by

Clear all filters

Created1995-03-24
Description

A detailed hydraulic analysis of Idle Hour Wash for the purpose of preparing a Letter of Map Revision.

Created1996 to 2006
Description

The objectives of this report are to document the on-site and off-site hydrologic and hydraulic assessment of the site and its characteristics, quantifying existing conditions peak discharges, and define the limits of 100-year on-site floodplains.

Created2005 to 2007
Description

In September 2004, ADOT awarded a contract for the Pinal County Corridors Definition Study to Kimley-Horn and Associates. The scope of the Pinal County Corridors Definition Study included the following activities:
* Confirm the need for the East Valley and the North-South corridors;
* Define planning-level corridor definition alternatives;
* Perform a technical

In September 2004, ADOT awarded a contract for the Pinal County Corridors Definition Study to Kimley-Horn and Associates. The scope of the Pinal County Corridors Definition Study included the following activities:
* Confirm the need for the East Valley and the North-South corridors;
* Define planning-level corridor definition alternatives;
* Perform a technical assessment of engineering, environmental, and land use compatibility constraints opportunities for the planning-level corridor definition alternatives;
* Identify to the extent possible, feasible and preferred planning-level corridor definitions on the basis of the technical evaluation;
* Document planning-level costs of corridor development (including studies, design, construction, and right-of-way costs) for the preferred corridor definitions.

The Pinal County Corridors Definition Study resulted in sufficient detail to provide a basis for the future establishment of geometric roadway alignments and corridor design concepts, the preservation of right-of-way, and the identification of required environmental clearance studies.

43188-Thumbnail Image.png
Created2005-06
Description

This report describes the development of base and future socioeconomic estimates for the Pinal Corridor Planning Model, developed by ADOT to support the evaluation of potential new highway corridors in Northern Pinal County. This section presents a summary of the methodology, data sources used, and historical trends in population and

This report describes the development of base and future socioeconomic estimates for the Pinal Corridor Planning Model, developed by ADOT to support the evaluation of potential new highway corridors in Northern Pinal County. This section presents a summary of the methodology, data sources used, and historical trends in population and employment growth. The following two sections present the base and future year methods and resulting estimates of population and employment.

42845-Thumbnail Image.png
Created2013-10
Description

The proposed Meridian Road Corridor Study is needed to support the continuing development and growth, occurring and anticipated, in the East Mesa, West Apache Junction, and within Pinal County. The purpose of the Meridian Road Corridor Study is to document conditions along the existing roadway and to develop alternatives that

The proposed Meridian Road Corridor Study is needed to support the continuing development and growth, occurring and anticipated, in the East Mesa, West Apache Junction, and within Pinal County. The purpose of the Meridian Road Corridor Study is to document conditions along the existing roadway and to develop alternatives that will increase the safety and future level of service of Meridian Road. This study will also establish a roadway footprint and develop the ultimate right‐of‐way requirement for the corridor. Finally, the study will be utilized as a guide for local agencies and future development along the corridor. The study area for the Meridian Road Corridor Study is approximately 13 miles in length.

42805-Thumbnail Image.png
Created2013-04
Description

This report and the accompanying Geographic Information System (GIS) datasets summarize the results of the workshop held in Florence, Arizona in 2010. At this workshop, stakeholders representing a broad range of organizations and interests identified and mapped the locations of important wildlife linkages across Pinal County. This report provides background

This report and the accompanying Geographic Information System (GIS) datasets summarize the results of the workshop held in Florence, Arizona in 2010. At this workshop, stakeholders representing a broad range of organizations and interests identified and mapped the locations of important wildlife linkages across Pinal County. This report provides background information on the importance and benefits of conserving wildlife linkages for both people and wildlife in Pinal County and describes the methods used during stakeholder workshops and in developing the accompanying GIS products. It includes a series of maps generated from the digitized stakeholder data that depict the general locations of wildlife linkages and potential barriers to wildlife movement within Pinal County. The maps are followed by tables with descriptive information about the habitat areas each linkage connects, the species each linkage serves, and known threats and potential conservation opportunities associated with each linkage.

42801-Thumbnail Image.png
Created2006-06-23
Description

Given the inevitable transportation changes associated with impending growth in Pinal County, there was a need for a method to assess how corresponding emissions changes might affect PM10 and Ozone concentrations in the county and at the monitor sites. The overall objective of the project was to develop methods or

Given the inevitable transportation changes associated with impending growth in Pinal County, there was a need for a method to assess how corresponding emissions changes might affect PM10 and Ozone concentrations in the county and at the monitor sites. The overall objective of the project was to develop methods or models that could be used in Pinal County to adequately address air pollution issues in the County.

42357-Thumbnail Image.png
Created1988-02-04
Description

This report is being submitted for the purpose of reducing the erosion setback limits. The information contained herein supports the claim that a safe reduction in the setback distance can occur.

42356-Thumbnail Image.png
Created1988-06-17
Description

Millstone Manor #6 is a subdivision that was recorded in the mid-1950's. All records indicate no engineering took place with regards to potential for drainage improvements. This report will address what the natural floodprone areas are and will recommend how future permits should be processed.

42341-Thumbnail Image.png
Created1992-08
Description

This report describes the hydrologic and hydraulic analysis. Development in the lower end of the watershed has occurred without knowledge of the floodplain's characteristics.