Matching Items (19)
Filtering by

Clear all filters

Created1994-04-29
Description

Phase IIA focuses on identifying alternatives for mitigating the hazards and problems, evaluating the alternatives for flood mitigation potential and cost effectiveness, and recommending a preferred alternative and flood control policy.

42959-Thumbnail Image.png
Created2013-06
Description

The purpose of the 2012 ADOT Bicycle and Pedestrian Plan Update is to update the 2003 plan and address the most critical bicycle and pedestrian transportation planning needs on the State Highway System, responding to the significant growth in Arizona that has occurred over the last decade. The Plan establishes

The purpose of the 2012 ADOT Bicycle and Pedestrian Plan Update is to update the 2003 plan and address the most critical bicycle and pedestrian transportation planning needs on the State Highway System, responding to the significant growth in Arizona that has occurred over the last decade. The Plan establishes a vision for bicycling and walking in Arizona.

43635-Thumbnail Image.png
Created2003-08-04
Description

With the advent of multi-modal transportation planning, and given that most of the major metropolitan areas in Arizona have implemented bicycle and pedestrian plans, it is now desirable that ADOT develop a bicycle and pedestrian plan that encompasses all of Arizona. The major intent of the Statewide Bicycle and Pedestrian

With the advent of multi-modal transportation planning, and given that most of the major metropolitan areas in Arizona have implemented bicycle and pedestrian plans, it is now desirable that ADOT develop a bicycle and pedestrian plan that encompasses all of Arizona. The major intent of the Statewide Bicycle and Pedestrian Plan is to provide a long-term plan for a system of shared roadways and bicycle and pedestrian facilities for the ADOT State Highway System. This includes the definition of the roles of the State and local government in the continual development of the bicycle and pedestrian transportation system in Arizona. It also includes the identification of all existing bicycle and pedestrian plans of the MPOs within Arizona to address the relationship between ADOT and the jurisdictions in the advancement of these plans. In addition, this plan includes design and maintenance guidelines for consideration by all implementing agencies in Arizona. Most importantly, this statewide bicycle and pedestrian plan guides ADOT in making transportation decisions impacting bicycling and pedestrian activity, and improves the accommodation of these non-motorized modes of transportation within Arizona’s multi-modal transportation system.

43634-Thumbnail Image.png
Created2004-12
Description

The Statewide Bicycle and Pedestrian Phase II Plan focuses on implementing some of the main recommendations of the Statewide Bicycle and Pedestrian Phase I Plan. This includes the development of documents for statewide distribution, the development of plans for a number of future programs, and significant improvements to the Bicycle

The Statewide Bicycle and Pedestrian Phase II Plan focuses on implementing some of the main recommendations of the Statewide Bicycle and Pedestrian Phase I Plan. This includes the development of documents for statewide distribution, the development of plans for a number of future programs, and significant improvements to the Bicycle and Pedestrian Program website.

43633-Thumbnail Image.png
Created2007-01-30
Description

This document provides a summary of activities completed in support of Phase III of the Arizona Statewide Bicycle and Pedestrian Program. The purpose of Phase III was to implement recommendations from the Arizona Statewide Bicycle and Pedestrian Plan Phase I and Phase II.

Created1990-07
Description

The purpose of this study, which represents Phase I, is to determine long range planning and land use policies for flood control and floodplain management in the southwest area.

42347-Thumbnail Image.png
Created1990-09-12
Description

The purpose of this report is to assist the Pima County Board of Supervisors in assessing whether the Black Wash area requires area-specific flood control policies.

42346-Thumbnail Image.png
Created1994-10
Description

The purpose of this study is to revise the existing Flood Insurance Study and Flood Insurance Rate Maps for a portion of the Canada del Oro Wash. This information will be used by Pima County to update existing flood plain information.

42343-Thumbnail Image.png
Created1992-09
Description

The study developed the 100-year floodplain limits within the watershed and identified the area between Westover Avenue and Valencia Road as a major flood hazard area affecting most of the properties along the channel.

42339-Thumbnail Image.png
Created1993-08-03
Description

This plan has focused on two program areas: 1) floodplain management through revised floodplain delineations and assessment of subsequent FEMA mapping revisions; and 2) basin-wide planning issues involving both short- and long-term drainage infrastructure and regulatory needs.