Filtering by
- All Subjects: Presidential Campaigns
- All Subjects: Floodplain management
- All Subjects: Hydrology
- All Subjects: Torices, Puente y Co
- Resource Type: Text
The objective of this Technical Data Notebook is to provide 100-yr peak discharges at a Concentration Point for the Unnamed 02 and 03 Washes, 100-yr floodplain boundary and erosion hazard information, using the most up-to-date topographic, hydrologic, and hydraulic data. This is a local study and has not been submitted to FEMA.
This floodplain study was prepared to identify the extent and magnitude of flooding within the boundary of the park under existing conditions. The results of the analysis and the associated hydrologic/hydraulic model will serve as the base condition model for all future developments to aid in the planning and design process.
This report is being submitted for the purpose of reducing the erosion setback limits. The information contained herein supports the claim that a safe reduction in the setback distance can occur.
Millstone Manor #6 is a subdivision that was recorded in the mid-1950's. All records indicate no engineering took place with regards to potential for drainage improvements. This report will address what the natural floodprone areas are and will recommend how future permits should be processed.
The Sutherland Valley is a broad, geologically-controlled floodplain. This study attempts to quantify the depth and extent of flooding so that floodplain permits can be issued for development which meets local and federal restrictions.
The purpose of this study, which represents Phase I, is to determine long range planning and land use policies for flood control and floodplain management in the southwest area.
The purpose of this report is to assist the Pima County Board of Supervisors in assessing whether the Black Wash area requires area-specific flood control policies.
The purpose of this study is to revise the existing Flood Insurance Study and Flood Insurance Rate Maps for a portion of the Canada del Oro Wash. This information will be used by Pima County to update existing flood plain information.
The study developed the 100-year floodplain limits within the watershed and identified the area between Westover Avenue and Valencia Road as a major flood hazard area affecting most of the properties along the channel.
This report describes the hydrologic and hydraulic analysis. Development in the lower end of the watershed has occurred without knowledge of the floodplain's characteristics.