Matching Items (48)
Filtering by

Clear all filters

85222-Thumbnail Image.png
Created2021-03
Description

In this study, Morrison Institute reviewed how ACEs are associated with diseases that are the leading causes of death for adults in Arizona. With this focus in mind, heart disease, cancer, stroke, diabetes, and chronic lower respiratory diseases like COPD or chronic bronchitis were included in this study.

43499-Thumbnail Image.png
ContributorsArizona. Department of Education (Publisher)
Created2005-02
Description

The Team Nutrition Grant Project began in 2003 with the goal to guide and assist schools to create and maintain a coordinated, comprehensive school health program. Such a program integrates a school’s child nutrition programs, with the classroom, the community, and entire school environment. A coordinated, comprehensive school health program

The Team Nutrition Grant Project began in 2003 with the goal to guide and assist schools to create and maintain a coordinated, comprehensive school health program. Such a program integrates a school’s child nutrition programs, with the classroom, the community, and entire school environment. A coordinated, comprehensive school health program (CSHP) can be implemented to create a healthy school environment through a “model” nutrition policy. Using the USDA’s Food and Nutrition Service Team Nutrition’s Changing the Scene, A Guide to Local Action, the project proposed to implement the model at a state level by forming a state level coalition of key decision makers within the school environment.

42259-Thumbnail Image.png
Created2013-11-25
Description

The objective of this Technical Data Notebook is to provide 100-yr peak discharges at a Concentration Point for the Unnamed 02 and 03 Washes, 100-yr floodplain boundary and erosion hazard information, using the most up-to-date topographic, hydrologic, and hydraulic data. This is a local study and has not been submitted

The objective of this Technical Data Notebook is to provide 100-yr peak discharges at a Concentration Point for the Unnamed 02 and 03 Washes, 100-yr floodplain boundary and erosion hazard information, using the most up-to-date topographic, hydrologic, and hydraulic data. This is a local study and has not been submitted to FEMA.

Created1990-07
Description

The purpose of this study, which represents Phase I, is to determine long range planning and land use policies for flood control and floodplain management in the southwest area.

42347-Thumbnail Image.png
Created1990-09-12
Description

The purpose of this report is to assist the Pima County Board of Supervisors in assessing whether the Black Wash area requires area-specific flood control policies.

42346-Thumbnail Image.png
Created1994-10
Description

The purpose of this study is to revise the existing Flood Insurance Study and Flood Insurance Rate Maps for a portion of the Canada del Oro Wash. This information will be used by Pima County to update existing flood plain information.

42343-Thumbnail Image.png
Created1992-09
Description

The study developed the 100-year floodplain limits within the watershed and identified the area between Westover Avenue and Valencia Road as a major flood hazard area affecting most of the properties along the channel.

42339-Thumbnail Image.png
Created1993-08-03
Description

This plan has focused on two program areas: 1) floodplain management through revised floodplain delineations and assessment of subsequent FEMA mapping revisions; and 2) basin-wide planning issues involving both short- and long-term drainage infrastructure and regulatory needs.

42330-Thumbnail Image.png
Created1987 to 1989
Description

Offsite drainage impacts the project site from several watersheds whose headwaters lie to the northeast of the project site. This report will address the manner in which the existing offsite and the post-development onsite drainage will be conveyed across this project.

42323-Thumbnail Image.png
Created1999-01
Description

This request for a Physical Map Revision is for a reach of Camino de Oeste Wash from Foret Road to Camino De Oeste Road. This PMR is to reflect improved topographical data available subsequent to the Flood Insurance Study of this area, and to establish base flood elevations for the

This request for a Physical Map Revision is for a reach of Camino de Oeste Wash from Foret Road to Camino De Oeste Road. This PMR is to reflect improved topographical data available subsequent to the Flood Insurance Study of this area, and to establish base flood elevations for the floodplain.