Matching Items (1,295)
Filtering by

Clear all filters

Created2005-06
Description

In a rule published July 2, 2002, EPA found the Arizona Department of Environmental Quality’s "Plan for Attainment of the 24-Hour PM10 Standard – Maricopa County PM10 Nonattainment Area" (May 1997), inadequate to achieve attainment of the 24-hour National Ambient Air Quality Standards for particulate matter 10 microns or fewer

In a rule published July 2, 2002, EPA found the Arizona Department of Environmental Quality’s "Plan for Attainment of the 24-Hour PM10 Standard – Maricopa County PM10 Nonattainment Area" (May 1997), inadequate to achieve attainment of the 24-hour National Ambient Air Quality Standards for particulate matter 10 microns or fewer in aerodynamic diameter (PM10) at the Salt River monitoring site. The 1997 ADEQ SIP revision included attainment and Reasonable Further Progress demonstrations for the 24-hour NAAQS at the Salt River air quality monitoring site of the Maricopa County PM10 Serious Nonattainment Area, as well as at three other monitoring sites in the Phoenix area, - the Maryvale, Gilbert, and West Chandler sites. On August 4, 1997, EPA approved ADEQ’s attainment and RFP demonstrations for the Salt River monitoring area, which showed that the 24-hour PM10 NAAQS would reach attainment in the area by May 1998. Due to continuing violations of the 24-hour PM10 NAAQS at the Salt River air quality monitoring site since May 1998, EPA subsequently required Arizona to submit a revision to correct SIP inadequacies. This document consists of Arizona’s revisions to the state implementation plan for the Maricopa County PM10 Serious Nonattainment Area as described by EPA in its Federal Register notice of disapproval.

42801-Thumbnail Image.png
Created2006-06-23
Description

Given the inevitable transportation changes associated with impending growth in Pinal County, there was a need for a method to assess how corresponding emissions changes might affect PM10 and Ozone concentrations in the county and at the monitor sites. The overall objective of the project was to develop methods or

Given the inevitable transportation changes associated with impending growth in Pinal County, there was a need for a method to assess how corresponding emissions changes might affect PM10 and Ozone concentrations in the county and at the monitor sites. The overall objective of the project was to develop methods or models that could be used in Pinal County to adequately address air pollution issues in the County.

Created2014-06
Description

This Campaign Effectiveness Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2013-2014 Clean Air and Clean Stormwater Program Campaigns. This project analyzed and tracked the overall effectiveness of the Clean Air Program after 24 campaign sessions. For the second

This Campaign Effectiveness Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2013-2014 Clean Air and Clean Stormwater Program Campaigns. This project analyzed and tracked the overall effectiveness of the Clean Air Program after 24 campaign sessions. For the second consecutive year, the survey also measured and tracked attitudes, knowledge, awareness, and behaviors related to stormwater management for the Clean Stormwater Program Campaign.

Created2013-06
Description

This Campaign Effectiveness Travel Behavioral Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2012-2013 Clean Air Campaign, as well as analyze the overall effectiveness of the air quality media campaign after 23 campaign sessions. New to the current study,

This Campaign Effectiveness Travel Behavioral Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2012-2013 Clean Air Campaign, as well as analyze the overall effectiveness of the air quality media campaign after 23 campaign sessions. New to the current study, the survey also measured baseline awareness/knowledge related to storm water and hazardous waste issues.

62304-Thumbnail Image.jpg
ContributorsPalgen-Maissoneuve, Mimi, 1918-1995 (Photographer)
Created1942 to 1962
62260-Thumbnail Image.jpg
ContributorsPalgen-Maissoneuve, Mimi, 1918-1995 (Photographer)
Created1942 to 1962
62271-Thumbnail Image.jpg
ContributorsPalgen-Maissoneuve, Mimi, 1918-1995 (Photographer)
Created1942 to 1962
62163-Thumbnail Image.jpg
ContributorsPalgen-Maissoneuve, Mimi, 1918-1995 (Photographer)
Created1942 to 1962
62193-Thumbnail Image.jpg
ContributorsPalgen-Maissoneuve, Mimi, 1918-1995 (Photographer)
Created1942 to 1962
62238-Thumbnail Image.jpg
ContributorsPalgen-Maissoneuve, Mimi, 1918-1995 (Photographer)
Created1942 to 1962