Matching Items (16)
Filtering by

Clear all filters

42436-Thumbnail Image.png
Created2007-10
Description

Develop a detailed operating plan for the freeway express/BRT routes identified in the Regional Transportation Plan as well as identify vehicle and infrastructure investments needed to support said routes.

42439-Thumbnail Image.png
Created2011-12
Description

Valley Metro periodically conducts surveys with Dial-A-Ride passengers to gather information on trip making, demographic, and rider satisfaction with transit services. Previous Dial-a-Ride studies were conducted in 2000, 2002, and 2007. Valley Metro commissioned WestGroup Research of Phoenix to conduct a telephone survey with valley DAR passengers.

42440-Thumbnail Image.png
Created2011-12
Description

Valley Metro commissioned WestGroup Research to conduct a mail survey with users of transit services that are alternatives to Dial-a-Ride. Respondents included users of cab coupon and voucher programs.

42442-Thumbnail Image.png
Created2008-04
Description

The Regional Transportation Plan and Proposition 400 identified funding for 13 regional parkand-ride lots to support transit operations. This study provides recommendations to ensure that park-and-ride implementation are aligned with operational requirements, especially regarding express bus and bus rapid transit needs. The Park-and-Ride Re-prioritization also describes issues concerning the Valley’s

The Regional Transportation Plan and Proposition 400 identified funding for 13 regional parkand-ride lots to support transit operations. This study provides recommendations to ensure that park-and-ride implementation are aligned with operational requirements, especially regarding express bus and bus rapid transit needs. The Park-and-Ride Re-prioritization also describes issues concerning the Valley’s overall park-and-ride network and makes recommendations to facilitate implementation.

42444-Thumbnail Image.png
Created2009-02
Description

From Oct. 8 through Dec. 18, 2007, RPTA conducted an Origin and Destination survey of the Valley Metro riders. The objectives were to examine the demographics and travel behavior characteristics of Valley Metro riders.

42449-Thumbnail Image.png
Created2001-06
Description

An Urban Design Team made up of local designers, national transit designers, and agency representatives, was assembled to develop a document that would guide the system design. In addition, a team of climatologists from Arizona State University researched the special performance needs of materials and cooling systems in our climate,

An Urban Design Team made up of local designers, national transit designers, and agency representatives, was assembled to develop a document that would guide the system design. In addition, a team of climatologists from Arizona State University researched the special performance needs of materials and cooling systems in our climate, providing input into the guidelines for shading and cooling devices, as well as a separate technical report. The Team worked to isolate the twenty elements of urban design most critical to the creation of a light rail system specific to this region and then developed guidelines for each one of those elements.

42501-Thumbnail Image.png
Created1999-10
Description

Construction of a habitat restoration project in the Salt River will begin in the spring of 2000 which will transform the riverbed to provide a variety of amenities including recreation opportunities, improved flood management, riparian vegetation and wildlife habitat. The Beyond the Tanks area surrounds the Rio Salado project and

Construction of a habitat restoration project in the Salt River will begin in the spring of 2000 which will transform the riverbed to provide a variety of amenities including recreation opportunities, improved flood management, riparian vegetation and wildlife habitat. The Beyond the Tanks area surrounds the Rio Salado project and is bounded by I-17 to the north, 32nd Street to the east, Broadway Road to the south and 19th Avenue to the west. The committee has adopted the name "Village at Rio Salado" for this area but will be referred to as "Beyond the Banks" in this report.

42319-Thumbnail Image.png
Created1999-06
Description

This study was developed to identify the resources and applicable methodology for the delineation of primary flood corridors.

42322-Thumbnail Image.png
Created1999-11-30
Description

The purpose of the Phase I study is to evaluate existing drainage conditions and to identify alternative flood control/floodplain management strategies which warrant further consideration.

42328-Thumbnail Image.png
Created1996-09-06
Description

Originally, the purpose of the study was to obtain either a Letter of Map Revision or a Physical Map Revision from the Federal Emergency Management Agency. Unfortunately, during the initial stages of the investigation, it became apparent that FEMA's guidelines for these types of map revisions could not be accommodated,

Originally, the purpose of the study was to obtain either a Letter of Map Revision or a Physical Map Revision from the Federal Emergency Management Agency. Unfortunately, during the initial stages of the investigation, it became apparent that FEMA's guidelines for these types of map revisions could not be accommodated, primarily due to flow-distribution conflicts.