Matching Items (3)
Filtering by

Clear all filters

118019-Thumbnail Image.png
Created1990-07-11
Description

Under contract HFR-PL-1(31)264, "Concrete Pavement Design and Rehabilitation," a comprehensive data base was created which contains pavement design and construction data, climatic information, traffic data, and condition data for 48 pavement sections. The data base includes projects from jointed concrete pavements (40 sections), prestressed concrete pavements (4 sections), continuousIy reinforced

Under contract HFR-PL-1(31)264, "Concrete Pavement Design and Rehabilitation," a comprehensive data base was created which contains pavement design and construction data, climatic information, traffic data, and condition data for 48 pavement sections. The data base includes projects from jointed concrete pavements (40 sections), prestressed concrete pavements (4 sections), continuousIy reinforced concrete pavements (2 sections), and 3-layer structural rehabilitation pavements (2 sections).

ContributorsArizona. Department of Transportation (Contributor)
Created2012-05-21
Description

The proposed action is the construction and operation of a new multilane freeway in the metropolitan Phoenix area extending approximately 22 to 24 miles from Interstate 10 west of Phoenix to Interstate 10 southeast of Phoenix. The facility would be the final extension of State Route 202L, an element of

The proposed action is the construction and operation of a new multilane freeway in the metropolitan Phoenix area extending approximately 22 to 24 miles from Interstate 10 west of Phoenix to Interstate 10 southeast of Phoenix. The facility would be the final extension of State Route 202L, an element of the Maricopa Association of Governments' adopted Regional Freeway and Highway System.