Matching Items (26)
Filtering by

Clear all filters

42459-Thumbnail Image.png
Created2014-04
Description

In fiscal year 2012, Clifton Unified School District’s student AIMS scores were lower than both its peer districts’ and state averages. The District’s instructional program needs improvement. For example, some students were not provided the statutorily required number of instructional hours, and one of its four teachers did not have

In fiscal year 2012, Clifton Unified School District’s student AIMS scores were lower than both its peer districts’ and state averages. The District’s instructional program needs improvement. For example, some students were not provided the statutorily required number of instructional hours, and one of its four teachers did not have a teaching certificate. The District’s operational efficiencies were mixed, with some costs higher and some costs lower than peer districts’. However, the District lacked proper oversight and adequate controls over nearly all of its operations. In particular, the District lacked basic administrative processes such as monitoring budgets and maintaining proper controls over expenditures resulting in it overspending its legal budget limits in fiscal years 2009, 2010, and 2011. The District also failed to meet several transportation safety requirements. For example, its primary driver was not certified to drive a school bus. Lastly, the District lacked proper supervision of inmate workers on its school campus.

42319-Thumbnail Image.png
Created1999-06
Description

This study was developed to identify the resources and applicable methodology for the delineation of primary flood corridors.

42320-Thumbnail Image.png
Created2000-07-24
Description

Work maps for the Mission Wash floodplain. Highlighted photographs show the floodplain limits and watersheds.

42322-Thumbnail Image.png
Created1999-11-30
Description

The purpose of the Phase I study is to evaluate existing drainage conditions and to identify alternative flood control/floodplain management strategies which warrant further consideration.

42323-Thumbnail Image.png
Created1999-01
Description

This request for a Physical Map Revision is for a reach of Camino de Oeste Wash from Foret Road to Camino De Oeste Road. This PMR is to reflect improved topographical data available subsequent to the Flood Insurance Study of this area, and to establish base flood elevations for the

This request for a Physical Map Revision is for a reach of Camino de Oeste Wash from Foret Road to Camino De Oeste Road. This PMR is to reflect improved topographical data available subsequent to the Flood Insurance Study of this area, and to establish base flood elevations for the floodplain.

42326-Thumbnail Image.png
Created1995-08-15
DescriptionA follow-up report that includes a copy of a USGS quadrangle map, an aerial photograph of the drainage basin, and documentation addressing the 1-hour, 100-year rainfall amount.
42328-Thumbnail Image.png
Created1996-09-06
Description

Originally, the purpose of the study was to obtain either a Letter of Map Revision or a Physical Map Revision from the Federal Emergency Management Agency. Unfortunately, during the initial stages of the investigation, it became apparent that FEMA's guidelines for these types of map revisions could not be accommodated,

Originally, the purpose of the study was to obtain either a Letter of Map Revision or a Physical Map Revision from the Federal Emergency Management Agency. Unfortunately, during the initial stages of the investigation, it became apparent that FEMA's guidelines for these types of map revisions could not be accommodated, primarily due to flow-distribution conflicts.

42329-Thumbnail Image.png
Created1994-07-01
Description

This report was prepared to document surface water hydrology and floodplain conditions in accordance with current standards of practice. This information is intended to support issuance of building permits, re-approval of construction drawings to current standards, and issuance of floodplain use permits, if needed.

42785-Thumbnail Image.png
Created2000-04-14
Description

The depiction of a historical-period property on an early map, whether a house, a ranch, a mining prospect, or an irrigation canal, is often the earliest (and sometimes the only) evidence that cultural features once existed in a particular place. Statistical Research used early maps as a regional preservation-planning tool

The depiction of a historical-period property on an early map, whether a house, a ranch, a mining prospect, or an irrigation canal, is often the earliest (and sometimes the only) evidence that cultural features once existed in a particular place. Statistical Research used early maps as a regional preservation-planning tool by systematically examining a group of early maps of the county for depictions of cultural features. The typology will be used to plot the sites, distinguished by type, on a single map (or possibly on a series of maps) to be digitized by Pima County and incorporated into its GIS database.

42786-Thumbnail Image.png
Created2000-05
Description

This report is one of several from Statistical Research Inc. written to develop the Cultural and Historic Resources Element of the Sonoran Desert Conservation Plan. Divided into four parts, the report summarizes available information that reflects the experience of (1) ancient peoples of Southern Arizona; (2) indigenous peoples; (3) non-indigenous

This report is one of several from Statistical Research Inc. written to develop the Cultural and Historic Resources Element of the Sonoran Desert Conservation Plan. Divided into four parts, the report summarizes available information that reflects the experience of (1) ancient peoples of Southern Arizona; (2) indigenous peoples; (3) non-indigenous peoples of the historical period; and (4) Pima County today.