Matching Items (9)
Filtering by

Clear all filters

Created2012-09
Description

This plan responds to key trends, emerging issues, and community visions and goals. The Plan includes strategies and actions for the years 2020 and 2040 to address identified transportation needs, while being sensitive to possible future funding constraints. This Final Report provides an overview of both the study effort and

This plan responds to key trends, emerging issues, and community visions and goals. The Plan includes strategies and actions for the years 2020 and 2040 to address identified transportation needs, while being sensitive to possible future funding constraints. This Final Report provides an overview of both the study effort and the work products developed throughout the planning process, which forms the basis for the final plan recommendations. The planning process analyzed the existing transportation system, land use and socioeconomic conditions within the study area; conducted in-depth local stakeholder interviews; developed future growth projections; provided opportunities for public input; and included an evaluation of alternative future solutions.

43031-Thumbnail Image.png
Created2011-09-19
Description

This study, and the resulting transportation plan, is funded through ADOT’s Planning Assistance for Rural Areas (PARA) program. ADOT and the Town of Colorado City have retained the consultant team of Wilbur Smith Associates to conduct the study under the oversight and direction of a Technical Advisory Committee (TAC) that

This study, and the resulting transportation plan, is funded through ADOT’s Planning Assistance for Rural Areas (PARA) program. ADOT and the Town of Colorado City have retained the consultant team of Wilbur Smith Associates to conduct the study under the oversight and direction of a Technical Advisory Committee (TAC) that includes members from the Town of Colorado City; adjacent Hildale City, Utah; Mohave County; the Arizona Department of Transportation Multimodal Planning Division; the ADOT Flagstaff District Engineer’s office; and other interested parties.

43015-Thumbnail Image.png
Created1997-12
Description

The Cochise County Airport is playing an increasing role in the promotion and development of the City of Willcox and the Cochise County area. The master plan has a capital improvement program that responds to the needs and desires for the short and long term aviation forecasts for Cochise County.

43011-Thumbnail Image.png
Created2007-06
Description

This Land Use Survey, conducted for the Cochise County Planning Department, was designed to elicit citizen opinions about the future pattern of growth in Cochise County and land use issues in areas outside of City limits. This project is an initial step in the County’s "Envision 2020: Land Use Planning

This Land Use Survey, conducted for the Cochise County Planning Department, was designed to elicit citizen opinions about the future pattern of growth in Cochise County and land use issues in areas outside of City limits. This project is an initial step in the County’s "Envision 2020: Land Use Planning in Cochise County" process, developed to measure citizen opinions on how growth is currently managed in the County and how to manage future growth.

42151-Thumbnail Image.png
Created2014-12
Description

In fiscal year 2012, St. David Unified School District’s student achievement was much higher than peer districts’, on average, and the District was reasonably efficient in most operational areas. The District’s administrative costs were much lower than peer districts’, but the District lacked sufficient accounting and computer controls. The District’s

In fiscal year 2012, St. David Unified School District’s student achievement was much higher than peer districts’, on average, and the District was reasonably efficient in most operational areas. The District’s administrative costs were much lower than peer districts’, but the District lacked sufficient accounting and computer controls. The District’s plant operations and transportation program were reasonably efficient overall. However, the District needs to accurately determine and report to the Arizona Department of Education its bus ridership information to help ensure the District is properly funded and to allow it the ability to calculate and monitor rider-based transportation performance measures. The District’s food service program was inefficient, with a cost per meal that was much higher than the peer districts’ average primarily because of overstaffing and inefficient purchasing practices. As a result, the District spent $44,110 of its Maintenance and Operation Fund monies to subsidize the program.

43267-Thumbnail Image.png
Created2005-09-07
Description

From May 2005 to June 2005, the Arizona Department of Environmental Quality conducted a study, Potable Well Sampling Task 4.0, to determine if the chromium and chromium VI plume due to the discharge of the Pacific Gas and Electronic Topock Compressor Station has migrated under the Colorado River and impacted

From May 2005 to June 2005, the Arizona Department of Environmental Quality conducted a study, Potable Well Sampling Task 4.0, to determine if the chromium and chromium VI plume due to the discharge of the Pacific Gas and Electronic Topock Compressor Station has migrated under the Colorado River and impacted water supplies in Arizona. The ADEQ investigated the total chromium and hexavalent chromium (chromium VI) concentrations in (1) public water supply wells, (2) combined industrial and domestic water supply wells, and (3) private domestic water supply wells at Topock and Golden Shores, Arizona. The communities of Topock and Golden Shores have expressed their concerns regarding the findings. Thus, the ADEQ requested the Arizona Department of Health Services to evaluate the potential health effects of exposure to well water contaminated with chromium.

43222-Thumbnail Image.png
Created2009-11
Description

This report summarizes the results of an economic impact analysis of the Rosemont Copper Project, an open-pit mining operation to be developed on a 15,000 acre site in Pima County about 30 miles southeast of Tucson. The analysis employed the REMI PI+ regional economic forecasting model to estimate the economic

This report summarizes the results of an economic impact analysis of the Rosemont Copper Project, an open-pit mining operation to be developed on a 15,000 acre site in Pima County about 30 miles southeast of Tucson. The analysis employed the REMI PI+ regional economic forecasting model to estimate the economic impacts of the Project for the Cochise/Pima County/Santa Cruz Counties study area, for the State of Arizona, and for the United States.

42391-Thumbnail Image.png
Created2007-04-30
Description

Grace Neal Parkway and Bank Street are located in the northern Kingman area partially outside of the Kingman city limits. This report discusses of creating a new arterial roadway providing safety and convenience for vehicular traffic and pedestrians. Although Grace Neal is referred to as a parkway, its designation for

Grace Neal Parkway and Bank Street are located in the northern Kingman area partially outside of the Kingman city limits. This report discusses of creating a new arterial roadway providing safety and convenience for vehicular traffic and pedestrians. Although Grace Neal is referred to as a parkway, its designation for design is arterial.

42410-Thumbnail Image.png
Created2009-06
Description

It was decided to revise the 1980 Havasu area study, since the area had changed so much. The members felt that to retain some control over the growth a revised area plan was needed and decided to have the area covered to be just the 72 square miles of the

It was decided to revise the 1980 Havasu area study, since the area had changed so much. The members felt that to retain some control over the growth a revised area plan was needed and decided to have the area covered to be just the 72 square miles of the Desert Hills Fire District, rather than the whole of the unincorporated Lake Havasu Area north of the City.