Matching Items (9)
Filtering by

Clear all filters

Created2012-09
Description

This plan responds to key trends, emerging issues, and community visions and goals. The Plan includes strategies and actions for the years 2020 and 2040 to address identified transportation needs, while being sensitive to possible future funding constraints. This Final Report provides an overview of both the study effort and

This plan responds to key trends, emerging issues, and community visions and goals. The Plan includes strategies and actions for the years 2020 and 2040 to address identified transportation needs, while being sensitive to possible future funding constraints. This Final Report provides an overview of both the study effort and the work products developed throughout the planning process, which forms the basis for the final plan recommendations. The planning process analyzed the existing transportation system, land use and socioeconomic conditions within the study area; conducted in-depth local stakeholder interviews; developed future growth projections; provided opportunities for public input; and included an evaluation of alternative future solutions.

Created2010 to 2011
Description

Pima County's Cienega Creek Natural Preserve surface water and groundwater monitoring project. This report summaries PAG's groundwater and surface water monitoring between July and June each fiscal/ monitoring year. The report contains monitoring methodology, comprehensive maps, and graphs of trends for surface flow volume, wet-dry flow lengths, groundwater levels and

Pima County's Cienega Creek Natural Preserve surface water and groundwater monitoring project. This report summaries PAG's groundwater and surface water monitoring between July and June each fiscal/ monitoring year. The report contains monitoring methodology, comprehensive maps, and graphs of trends for surface flow volume, wet-dry flow lengths, groundwater levels and water chemistry. It also contains information on drought, erosion and repeat photography.

43015-Thumbnail Image.png
Created1997-12
Description

The Cochise County Airport is playing an increasing role in the promotion and development of the City of Willcox and the Cochise County area. The master plan has a capital improvement program that responds to the needs and desires for the short and long term aviation forecasts for Cochise County.

43011-Thumbnail Image.png
Created2007-06
Description

This Land Use Survey, conducted for the Cochise County Planning Department, was designed to elicit citizen opinions about the future pattern of growth in Cochise County and land use issues in areas outside of City limits. This project is an initial step in the County’s "Envision 2020: Land Use Planning

This Land Use Survey, conducted for the Cochise County Planning Department, was designed to elicit citizen opinions about the future pattern of growth in Cochise County and land use issues in areas outside of City limits. This project is an initial step in the County’s "Envision 2020: Land Use Planning in Cochise County" process, developed to measure citizen opinions on how growth is currently managed in the County and how to manage future growth.

42151-Thumbnail Image.png
Created2014-12
Description

In fiscal year 2012, St. David Unified School District’s student achievement was much higher than peer districts’, on average, and the District was reasonably efficient in most operational areas. The District’s administrative costs were much lower than peer districts’, but the District lacked sufficient accounting and computer controls. The District’s

In fiscal year 2012, St. David Unified School District’s student achievement was much higher than peer districts’, on average, and the District was reasonably efficient in most operational areas. The District’s administrative costs were much lower than peer districts’, but the District lacked sufficient accounting and computer controls. The District’s plant operations and transportation program were reasonably efficient overall. However, the District needs to accurately determine and report to the Arizona Department of Education its bus ridership information to help ensure the District is properly funded and to allow it the ability to calculate and monitor rider-based transportation performance measures. The District’s food service program was inefficient, with a cost per meal that was much higher than the peer districts’ average primarily because of overstaffing and inefficient purchasing practices. As a result, the District spent $44,110 of its Maintenance and Operation Fund monies to subsidize the program.

42727-Thumbnail Image.png
Created2001-02
Description

Concerns research into the origin of water sustaining the Bingham Cienega. For purposes of long term management, we need to understand what the source of water is for the various riparian areas.

42726-Thumbnail Image.png
Created2001-02
Description

Conducted for the Pima County Flood Control District by the Pima Association of Governments in order to determine if stormflows on the Cienega Creek have changed over time when analyzed in terms of frequency, volume, and seasonallity. In a data search that extends back to the 1950s, they were able

Conducted for the Pima County Flood Control District by the Pima Association of Governments in order to determine if stormflows on the Cienega Creek have changed over time when analyzed in terms of frequency, volume, and seasonallity. In a data search that extends back to the 1950s, they were able to determine the daily mean flow, the flows over base, and the annual peak flows of the Cienega Creek.

42723-Thumbnail Image.png
Created2001-05
Description

Provides basic information about the source of surface water in Cienega Creek at the downstream end of the natural preserve, which will contribute to efforts to conceptualize and implement effective land management proposals for the SDCP. Study results indicate that the surface flow or subflow from Agua Verde Creek do

Provides basic information about the source of surface water in Cienega Creek at the downstream end of the natural preserve, which will contribute to efforts to conceptualize and implement effective land management proposals for the SDCP. Study results indicate that the surface flow or subflow from Agua Verde Creek do not significantly influence the water in the Cienega Creek.

43222-Thumbnail Image.png
Created2009-11
Description

This report summarizes the results of an economic impact analysis of the Rosemont Copper Project, an open-pit mining operation to be developed on a 15,000 acre site in Pima County about 30 miles southeast of Tucson. The analysis employed the REMI PI+ regional economic forecasting model to estimate the economic

This report summarizes the results of an economic impact analysis of the Rosemont Copper Project, an open-pit mining operation to be developed on a 15,000 acre site in Pima County about 30 miles southeast of Tucson. The analysis employed the REMI PI+ regional economic forecasting model to estimate the economic impacts of the Project for the Cochise/Pima County/Santa Cruz Counties study area, for the State of Arizona, and for the United States.