Matching Items (4)
Filtering by

Clear all filters

42631-Thumbnail Image.jpg
Created2001-09
Description

Provides insights on historical and current issues in transportation planning. The first section describes the last five decades of planning efforts, funding initiatives and the increasing use of the roadway system. The second section is a series of fact sheets and maps of each subregion that presents the extent of

Provides insights on historical and current issues in transportation planning. The first section describes the last five decades of planning efforts, funding initiatives and the increasing use of the roadway system. The second section is a series of fact sheets and maps of each subregion that presents the extent of the roadways, traffic volumes on major streets, transit and bicycle facility availability, future planned improvements, issues within the subregion, an overlay of the draft biological reserve, and in the northwest, a further overlay of pygmy-owl habitat with a detailed analysis of bond projects.

42619-Thumbnail Image.jpg
Created2001-10
Description

Provides background information relevant to the Circulation Element of the draft Comprehensive Land Use Plan. It describes historic traffic volumes for roads within the various subregional planning areas of Pima County, and compare Pima County trends to national data in areas such as vehicle ownership, travel time, vehicle miles traveled,

Provides background information relevant to the Circulation Element of the draft Comprehensive Land Use Plan. It describes historic traffic volumes for roads within the various subregional planning areas of Pima County, and compare Pima County trends to national data in areas such as vehicle ownership, travel time, vehicle miles traveled, work trip modes of travel, registration, and vehicle costs.

42617-Thumbnail Image.jpg
Created2001-10
Description

In order to work effectively, concurrency requirements and level of service standards mus be an integral part of long term planning and the development review process. To create incentives for density, affordable housing, and mixed use development, staff will propose the application of lower level of service standards for land

In order to work effectively, concurrency requirements and level of service standards mus be an integral part of long term planning and the development review process. To create incentives for density, affordable housing, and mixed use development, staff will propose the application of lower level of service standards for land use types appropriate to certain growth areas.

42556-Thumbnail Image.png
Created2007-08-08
Description

The Augusta Resources Corporation proposes to construct the Rosemont Mine project in the northern Santa Rita Mountains. This report is a reconnaissance analysis of the conceptual flow and water balance in the area. The conceptual flow model for the area is based on topography, geology and precipitation and identifies the

The Augusta Resources Corporation proposes to construct the Rosemont Mine project in the northern Santa Rita Mountains. This report is a reconnaissance analysis of the conceptual flow and water balance in the area. The conceptual flow model for the area is based on topography, geology and precipitation and identifies the likely flow paths in the watershed and aquifer system. The water balance includes estimates of recharge to and groundwater flow from the area; there is no evapotranspiration discharge from the regional groundwater.