This report, required by the National Highway Traffic Safety Administration provides an update of highway safety projects throughout the state of Arizona during the Federal Fiscal Year as administered by the Arizona Governor’s Office of Highway Safety.

Created2010 to 2017
Description

The Office of Highway Safety produces the annual Highway Safety Plan to serve as the implementation guide for highway safety projects throughout Arizona. The Plan also is an application for funding through the National Highway Traffic Safety Administration. Project selection is data driven and utilizes state and national traffic safety

The Office of Highway Safety produces the annual Highway Safety Plan to serve as the implementation guide for highway safety projects throughout Arizona. The Plan also is an application for funding through the National Highway Traffic Safety Administration. Project selection is data driven and utilizes state and national traffic safety data (e.g., crashes, fatalities, injuries, citations, etc.). Knowledge of the Arizona political, economic, and demographic environments, as well as highway safety expertise on the part of staff and other partners also are taken into account where appropriate.

43024-Thumbnail Image.png
Created2007-03
Description

The Arizona Department of Transportation has been involved with railroad planning since 1976, with its first State Rail Plan Update issued in 1978. The most recent report, the 2000 Arizona State Rail Plan Update was an important starting point for this Inventory and Assessment in that the seven-year-old study provides

The Arizona Department of Transportation has been involved with railroad planning since 1976, with its first State Rail Plan Update issued in 1978. The most recent report, the 2000 Arizona State Rail Plan Update was an important starting point for this Inventory and Assessment in that the seven-year-old study provides the description and inventory of Arizona railroads as they existed at that time. There have been a number of important changes over the intervening years, and these are reflected in this 2007 Inventory and Assessment. In addition to the 2000 State Rail Plan Update, RLBA made use of the 2003 Maricopa Association of Governments (MAG) High-Capacity Transit Study and the 1998 Arizona High Speed Rail Feasibility Study. The information contained in this report was gathered from a number of sources, including the railroads themselves, ADOT, the Arizona Corporation Commission, MAG and numerous Arizona officials. A listing of persons who contributed to this Railroad Inventory and Assessment is provided under “Acknowledgements” inside the front cover. Information in this report also was obtained from the Association of American Railroads and from RLBA’s extensive data banks.

42126-Thumbnail Image.png
Created2010-05
Description

The Pinetop-Lakeside Pedestrian Safety and Transportation Study is a PARA that is a joint effort of ADOT and the Town of Pinetop-Lakeside. The pedestrian study reviewed past and current information and considered future travel demand.

42363-Thumbnail Image.png
Created2009-01-21
Description

Covers an area in southeastern Pima County that drains the Arivaca Creek watershed. The purpose of the report is to estimate peak discharge for the 50 year storm frequency event, utilizing the rational method (Q=CiA). This method pre-dates that outlined in the Hydrology Manual for Engineering Design and Floodplain Management

Covers an area in southeastern Pima County that drains the Arivaca Creek watershed. The purpose of the report is to estimate peak discharge for the 50 year storm frequency event, utilizing the rational method (Q=CiA). This method pre-dates that outlined in the Hydrology Manual for Engineering Design and Floodplain Management within Pima County, Sept. 1979, and is considered less accurate. It is recommended that this report be archived and discontinued for use for regulatory purposes.

42356-Thumbnail Image.png
Created1988-06-17
Description

Millstone Manor #6 is a subdivision that was recorded in the mid-1950's. All records indicate no engineering took place with regards to potential for drainage improvements. This report will address what the natural floodprone areas are and will recommend how future permits should be processed.

42349-Thumbnail Image.png
Created1989 to 1991
Description

The purpose of the study is to identify existing flooding problems for fifteen homes adjacent and west of Holladay Street which have experienced flooding in the past three years. A 1991 follow-up report is included that corrects an error in the earlier report's estimation of the split flow quantities at

The purpose of the study is to identify existing flooding problems for fifteen homes adjacent and west of Holladay Street which have experienced flooding in the past three years. A 1991 follow-up report is included that corrects an error in the earlier report's estimation of the split flow quantities at the intersection.

42347-Thumbnail Image.png
Created1990-09-12
Description

The purpose of this report is to assist the Pima County Board of Supervisors in assessing whether the Black Wash area requires area-specific flood control policies.

42345-Thumbnail Image.png
Created1992-01
Description

This study proposes to reduce flood damages from both Tanque Verde Creek and offsite flows, as they affect the Fortyniner's Country Club Estates and the Arbor Vista subdivisions.

42330-Thumbnail Image.png
Created1987 to 1989
Description

Offsite drainage impacts the project site from several watersheds whose headwaters lie to the northeast of the project site. This report will address the manner in which the existing offsite and the post-development onsite drainage will be conveyed across this project.