Matching Items (11)
Filtering by

Clear all filters

Created2009 to 2016
Description

This report, required by the National Highway Traffic Safety Administration provides an update of highway safety projects throughout the state of Arizona during the Federal Fiscal Year as administered by the Arizona Governor’s Office of Highway Safety.

Created2010 to 2017
Description

The Office of Highway Safety produces the annual Highway Safety Plan to serve as the implementation guide for highway safety projects throughout Arizona. The Plan also is an application for funding through the National Highway Traffic Safety Administration. Project selection is data driven and utilizes state and national traffic safety

The Office of Highway Safety produces the annual Highway Safety Plan to serve as the implementation guide for highway safety projects throughout Arizona. The Plan also is an application for funding through the National Highway Traffic Safety Administration. Project selection is data driven and utilizes state and national traffic safety data (e.g., crashes, fatalities, injuries, citations, etc.). Knowledge of the Arizona political, economic, and demographic environments, as well as highway safety expertise on the part of staff and other partners also are taken into account where appropriate.

Created1998 to 2003
Description

On March 2, 1999, the Board of Supervisors of Pima County, Arizona adopted the Sonoran Desert Conservation Plan. This Plan is the largest and most comprehensive regional multi-species conservation plan in the United States. These memorandums of understanding record the agreements made with cooperating agencies.

43024-Thumbnail Image.png
Created2007-03
Description

The Arizona Department of Transportation has been involved with railroad planning since 1976, with its first State Rail Plan Update issued in 1978. The most recent report, the 2000 Arizona State Rail Plan Update was an important starting point for this Inventory and Assessment in that the seven-year-old study provides

The Arizona Department of Transportation has been involved with railroad planning since 1976, with its first State Rail Plan Update issued in 1978. The most recent report, the 2000 Arizona State Rail Plan Update was an important starting point for this Inventory and Assessment in that the seven-year-old study provides the description and inventory of Arizona railroads as they existed at that time. There have been a number of important changes over the intervening years, and these are reflected in this 2007 Inventory and Assessment. In addition to the 2000 State Rail Plan Update, RLBA made use of the 2003 Maricopa Association of Governments (MAG) High-Capacity Transit Study and the 1998 Arizona High Speed Rail Feasibility Study. The information contained in this report was gathered from a number of sources, including the railroads themselves, ADOT, the Arizona Corporation Commission, MAG and numerous Arizona officials. A listing of persons who contributed to this Railroad Inventory and Assessment is provided under “Acknowledgements” inside the front cover. Information in this report also was obtained from the Association of American Railroads and from RLBA’s extensive data banks.

42126-Thumbnail Image.png
Created2010-05
Description

The Pinetop-Lakeside Pedestrian Safety and Transportation Study is a PARA that is a joint effort of ADOT and the Town of Pinetop-Lakeside. The pedestrian study reviewed past and current information and considered future travel demand.

42739-Thumbnail Image.png
Created2000-01
Description

This document and the Geographic Information System file that is now a part of the County library of over 1000 coverages, gives the scientific community access to mapping that better differentiates perennial, ephemeral and intermittent watercourses, and provides more comprehensive coverage of shallow groundwater sources. This data is significant because

This document and the Geographic Information System file that is now a part of the County library of over 1000 coverages, gives the scientific community access to mapping that better differentiates perennial, ephemeral and intermittent watercourses, and provides more comprehensive coverage of shallow groundwater sources. This data is significant because riparian habitat is one of the most important and least protected of the habitat types in Pima County.

42733-Thumbnail Image.png
Created2000-07
Description

The purpose of this project was to compile information on groundwater withdrawals and surface water diversions near perennial streams, intermittent streams, and shallow groundwater areas previously identified by PAG for the SDCP. The information could be used to prioritize future investigations of potential impacts of these withdrawals and diversions on

The purpose of this project was to compile information on groundwater withdrawals and surface water diversions near perennial streams, intermittent streams, and shallow groundwater areas previously identified by PAG for the SDCP. The information could be used to prioritize future investigations of potential impacts of these withdrawals and diversions on riparian and aquatic habitats for the SDCP.

42727-Thumbnail Image.png
Created2001-02
Description

Concerns research into the origin of water sustaining the Bingham Cienega. For purposes of long term management, we need to understand what the source of water is for the various riparian areas.

42726-Thumbnail Image.png
Created2001-02
Description

Conducted for the Pima County Flood Control District by the Pima Association of Governments in order to determine if stormflows on the Cienega Creek have changed over time when analyzed in terms of frequency, volume, and seasonallity. In a data search that extends back to the 1950s, they were able

Conducted for the Pima County Flood Control District by the Pima Association of Governments in order to determine if stormflows on the Cienega Creek have changed over time when analyzed in terms of frequency, volume, and seasonallity. In a data search that extends back to the 1950s, they were able to determine the daily mean flow, the flows over base, and the annual peak flows of the Cienega Creek.

42723-Thumbnail Image.png
Created2001-05
Description

Provides basic information about the source of surface water in Cienega Creek at the downstream end of the natural preserve, which will contribute to efforts to conceptualize and implement effective land management proposals for the SDCP. Study results indicate that the surface flow or subflow from Agua Verde Creek do

Provides basic information about the source of surface water in Cienega Creek at the downstream end of the natural preserve, which will contribute to efforts to conceptualize and implement effective land management proposals for the SDCP. Study results indicate that the surface flow or subflow from Agua Verde Creek do not significantly influence the water in the Cienega Creek.