Matching Items (1,163)
Filtering by

Clear all filters

Created1948-12-26
DescriptionPhotograph of family consisting of two older men, two younger women, and four younger men. The back states that his photo was taken in "Canton" or what is now known as GuangZhou. Same family photo as Melikain1313.
43474-Thumbnail Image.png
Created2002-03
Description

The Clean Air Act states that an area can be redesignated to attainment if specific conditions are met, such as attainment of federal air quality standards; approval of a state implementation plan and a maintenance plan; and permanent and enforceable improvements in air quality. This document demonstrates that all CAA

The Clean Air Act states that an area can be redesignated to attainment if specific conditions are met, such as attainment of federal air quality standards; approval of a state implementation plan and a maintenance plan; and permanent and enforceable improvements in air quality. This document demonstrates that all CAA requirements for attainment have been met, summarizes the progress of the area in attaining the PM10 standards, demonstrates that the Payson area qualifies for EPA’s Clean Data Policy and Limited Maintenance Plan option, and includes a maintenance plan to assure continued attainment for ten years after the redesignation. This document is a formal request to the U.S. Environmental Protection Agency to redesignate the Payson, Arizona PM10 nonattainment area to attainment of the health-based 24-hour average and annual average PM10 National Ambient Air Quality Standards.

Analyses included in this document show that ambient air quality measurements have remained below the NAAQS for PM10, and both the 24-hour average design value and annual average PM10 design value are below EPA allowable limits. This document also demonstrates that the emission reduction control measures responsible for the air quality improvement are both permanent and enforceable.

42061-Thumbnail Image.png
Created2014-03
Description

In fiscal year 2012, Payson Unified School District’s student achievement was slightly higher than peer district averages, and the District’s operations were reasonably efficient in most areas. The District’s administrative costs were similar to the peer district average, but the District lacked adequate controls over user access to its computer

In fiscal year 2012, Payson Unified School District’s student achievement was slightly higher than peer district averages, and the District’s operations were reasonably efficient in most areas. The District’s administrative costs were similar to the peer district average, but the District lacked adequate controls over user access to its computer network and systems. The District’s plant operations cost per square foot was similar to the peer districts’ average, but its cost per pupil was higher because it operated more building space per pupil. The District’s transportation program costs were higher than peer district averages, but the program was reasonably efficient, with efficient bus routes and proper fuel usage monitoring. However, the District’s food service program was less than efficient, with a higher cost per meal than the peer districts’ average because of higher staffing costs and some food service vendor contract terms that were not favorable to the District. As a result, the District spent $24,590 of its Maintenance and Operation Fund monies to subsidize its food service program.

77854-Thumbnail Image.png
Created1866
Description
A contract between Marcelino, a Chinese immigrant, and Felipe Macao. The contract was to last for one year and lists the legal requirements of both the employee and the employer. Marcelino was originally from Canton. Notes that Marcelino had completed a contract with Jose Manuel Laos previously. Contract signed by

A contract between Marcelino, a Chinese immigrant, and Felipe Macao. The contract was to last for one year and lists the legal requirements of both the employee and the employer. Marcelino was originally from Canton. Notes that Marcelino had completed a contract with Jose Manuel Laos previously. Contract signed by Felipe Macao, Jose de Garcia, Acarpo Aloansa, and Marcelino. Signed in Chinese.
77853-Thumbnail Image.png
Created1868
DescriptionA contract between Guillermo, a Chinese settler, and Felipe Macao. The contract was to last for one year and lists the legal requirements of both the employee and the employer. Guillermo was originally from Canton. Signed by Jose de Garcia, Felipe Macau, Acarpo Aloansa, and Guillermo, who signed in Chinese
77852-Thumbnail Image.png
Created1866-05-30
DescriptionThis is a labor contract that was shared between Higiorio, a Chinese settler, and his owner, Pedro del Campo; the term of the contract was for one year. 1866.
77851-Thumbnail Image.png
Created1866-05-20
Description

A contract between Cristobal, a Chinese immigrant, and Serafin Gomez. The contract was to last for six months and lists the legal requirements of both the employee and the employer. Noted that Cristobal completed a contract with Felipe Mulhice. Cristobal was originally from Canton. Signed by Serafin Gomez, the governor,

A contract between Cristobal, a Chinese immigrant, and Serafin Gomez. The contract was to last for six months and lists the legal requirements of both the employee and the employer. Noted that Cristobal completed a contract with Felipe Mulhice. Cristobal was originally from Canton. Signed by Serafin Gomez, the governor, and Cristobal, who signed in Chinese.

77841-Thumbnail Image.png
Created1889-07-23
DescriptionA death certificate for Horentio Bay, who died at the Civil Hospital of Our Lady of Mercy in Havana. He died from tuberculosis and was buried in the general cemetery.
77830-Thumbnail Image.png
Created1868-05-20
Description
A contract between Enrique, a Chinese settler, and Juan, a Cuban landowner. The contract was to last for a year and lists the legal requirements for both the employee and the employer. Juan noted that Enrique completed a contract with Miguel Tabra previously. Juan was originally from Canton. Contract signed

A contract between Enrique, a Chinese settler, and Juan, a Cuban landowner. The contract was to last for a year and lists the legal requirements for both the employee and the employer. Juan noted that Enrique completed a contract with Miguel Tabra previously. Juan was originally from Canton. Contract signed by Juan, Juan Gonzales, Carlos Gonzales. Signed by the settler in Chinese.
78254-Thumbnail Image.png
Created1861
Description

Records for the ship Carmelita, which brought Chinese settlers from China to Cuba under contract with Rita Barbarca a la Lara. On this trip, Carmelita brought settlers from China to work in Matanzas.