Matching Items (44)
Filtering by

Clear all filters

Created1995-03-24
Description

A detailed hydraulic analysis of Idle Hour Wash for the purpose of preparing a Letter of Map Revision.

Created1996 to 2006
Description

The objectives of this report are to document the on-site and off-site hydrologic and hydraulic assessment of the site and its characteristics, quantifying existing conditions peak discharges, and define the limits of 100-year on-site floodplains.

Created1994-04-29
Description

Phase IIA focuses on identifying alternatives for mitigating the hazards and problems, evaluating the alternatives for flood mitigation potential and cost effectiveness, and recommending a preferred alternative and flood control policy.

Created1998 to 2016
Description

The Floodplain Management Act of 1973 authorized Arizona counties to adopt rules and regulations concerning management of floodplain areas. The Pima County Board of Supervisors, which sits as the Pima County Flood Control District Board of Directors, organized the Pima County Flood Control District on June 5, 1978. The District

The Floodplain Management Act of 1973 authorized Arizona counties to adopt rules and regulations concerning management of floodplain areas. The Pima County Board of Supervisors, which sits as the Pima County Flood Control District Board of Directors, organized the Pima County Flood Control District on June 5, 1978. The District is responsible for floodplain management activities for unincorporated areas in Pima County (with the exception of national forests, parks, monuments, and Indian Nations) and for the City of South Tucson.

43031-Thumbnail Image.png
Created2011-09-19
Description

This study, and the resulting transportation plan, is funded through ADOT’s Planning Assistance for Rural Areas (PARA) program. ADOT and the Town of Colorado City have retained the consultant team of Wilbur Smith Associates to conduct the study under the oversight and direction of a Technical Advisory Committee (TAC) that

This study, and the resulting transportation plan, is funded through ADOT’s Planning Assistance for Rural Areas (PARA) program. ADOT and the Town of Colorado City have retained the consultant team of Wilbur Smith Associates to conduct the study under the oversight and direction of a Technical Advisory Committee (TAC) that includes members from the Town of Colorado City; adjacent Hildale City, Utah; Mohave County; the Arizona Department of Transportation Multimodal Planning Division; the ADOT Flagstaff District Engineer’s office; and other interested parties.

43267-Thumbnail Image.png
Created2005-09-07
Description

From May 2005 to June 2005, the Arizona Department of Environmental Quality conducted a study, Potable Well Sampling Task 4.0, to determine if the chromium and chromium VI plume due to the discharge of the Pacific Gas and Electronic Topock Compressor Station has migrated under the Colorado River and impacted

From May 2005 to June 2005, the Arizona Department of Environmental Quality conducted a study, Potable Well Sampling Task 4.0, to determine if the chromium and chromium VI plume due to the discharge of the Pacific Gas and Electronic Topock Compressor Station has migrated under the Colorado River and impacted water supplies in Arizona. The ADEQ investigated the total chromium and hexavalent chromium (chromium VI) concentrations in (1) public water supply wells, (2) combined industrial and domestic water supply wells, and (3) private domestic water supply wells at Topock and Golden Shores, Arizona. The communities of Topock and Golden Shores have expressed their concerns regarding the findings. Thus, the ADEQ requested the Arizona Department of Health Services to evaluate the potential health effects of exposure to well water contaminated with chromium.

42401-Thumbnail Image.png
Created2009-01-11
Description

The purpose of the Flood Response Plan is to reduce the potential for property damage and loss of life resulting from floods on the Beaver Dam Wash at the community of Beaver Dam. This report is intentionally short and concise to make it easily usable during a flood emergency.

42391-Thumbnail Image.png
Created2007-04-30
Description

Grace Neal Parkway and Bank Street are located in the northern Kingman area partially outside of the Kingman city limits. This report discusses of creating a new arterial roadway providing safety and convenience for vehicular traffic and pedestrians. Although Grace Neal is referred to as a parkway, its designation for

Grace Neal Parkway and Bank Street are located in the northern Kingman area partially outside of the Kingman city limits. This report discusses of creating a new arterial roadway providing safety and convenience for vehicular traffic and pedestrians. Although Grace Neal is referred to as a parkway, its designation for design is arterial.

42361-Thumbnail Image.png
Created1986-01-28
Description

The Flecha Caida study area encompasses approximately eight square miles of the foothill region of the Santa Catalina Mountains. The three major washes studied include Finger Rock Wash, Valley View Wash, and Flecha Caida Wash. One tributary (Sky Club Wash) to the Valley View Wash and three tributaries to the

The Flecha Caida study area encompasses approximately eight square miles of the foothill region of the Santa Catalina Mountains. The three major washes studied include Finger Rock Wash, Valley View Wash, and Flecha Caida Wash. One tributary (Sky Club Wash) to the Valley View Wash and three tributaries to the Finger Rock Wash were also included in this study.

42360-Thumbnail Image.png
Created1986-03-15
Description

This report is the first phase of a study to provide a basin management plan for the Tucson Mountain Drainage Basin. Phase II will identify and evaluate alternative specific solutions to flood plain management measures with Phase III accomplishing conceptual designs for the selected alternatives.