Matching Items (45)
Filtering by

Clear all filters

42401-Thumbnail Image.png
Created2009-01-11
Description

The purpose of the Flood Response Plan is to reduce the potential for property damage and loss of life resulting from floods on the Beaver Dam Wash at the community of Beaver Dam. This report is intentionally short and concise to make it easily usable during a flood emergency.

Created2009 to 2016
Description

This report, required by the National Highway Traffic Safety Administration provides an update of highway safety projects throughout the state of Arizona during the Federal Fiscal Year as administered by the Arizona Governor’s Office of Highway Safety.

Created2010 to 2017
Description

The Office of Highway Safety produces the annual Highway Safety Plan to serve as the implementation guide for highway safety projects throughout Arizona. The Plan also is an application for funding through the National Highway Traffic Safety Administration. Project selection is data driven and utilizes state and national traffic safety

The Office of Highway Safety produces the annual Highway Safety Plan to serve as the implementation guide for highway safety projects throughout Arizona. The Plan also is an application for funding through the National Highway Traffic Safety Administration. Project selection is data driven and utilizes state and national traffic safety data (e.g., crashes, fatalities, injuries, citations, etc.). Knowledge of the Arizona political, economic, and demographic environments, as well as highway safety expertise on the part of staff and other partners also are taken into account where appropriate.

42284-Thumbnail Image.png
Created2010-10-15
Description

This Technical Data Notebook has been prepared in support of a Letter of Map Revision submittal to amend the 100-year floodplain, or Special Flood Hazard Area associated with Finger Rock Wash in Pima County, Arizona. The purpose of this LOMR application is to revise the effective Flood Insurance Rate Ma

This Technical Data Notebook has been prepared in support of a Letter of Map Revision submittal to amend the 100-year floodplain, or Special Flood Hazard Area associated with Finger Rock Wash in Pima County, Arizona. The purpose of this LOMR application is to revise the effective Flood Insurance Rate Map SFHA boundaries based on updated and more detailed information. No new hydraulic structures are present within the study limits.

Created2007-10-12
Description

Purpose of this report is to provide a detailed analysis of the runoff characteristics of the Diamond Bell Ranch area.To this end, HEC-HMS models were generated to analyze the runoff under existing watershed conditions.

42314-Thumbnail Image.png
Created2003-10-01
Description

This report documents the existing drainage conditions related to Silverbell Trails Estates roadways and 100-year flow depths and includes qualitative and quantitative analyses of the existing hydrologic and hydraulic conditions.

42316-Thumbnail Image.png
Created2003-12-30
Description

The purpose of this study is to determine the hydrologic and hydraulic impacts of the Aspen Fire of the summer of 2003 on the Sabino Canyon and Carter Canyon watersheds, which are in the vicinity of the Town of Summerhaven, located on Mount Lemmon in the Santa Catalina Mountains, Arizona.

Created1995-03-24
Description

A detailed hydraulic analysis of Idle Hour Wash for the purpose of preparing a Letter of Map Revision.

42319-Thumbnail Image.png
Created1999-06
Description

This study was developed to identify the resources and applicable methodology for the delineation of primary flood corridors.