Matching Items (173)
Filtering by

Clear all filters

42853-Thumbnail Image.png
Created2005-11-02
Description

A report shall be prepared at least every five years beginning in 1985 and shall indicate the past efforts of the district in eliminating or minimizing flood control problems and state the planned future work of the district to eliminate or minimize flood control problems.

42852-Thumbnail Image.png
Created2009
Description

The 2009 Comprehensive Floodplain Management Plan and Program is intended to be used as a general guide for future decision-making in District activities. The Plan aims to present adequate background information to aid District staff in prioritizing areas for future studies and projects. The Plan identifies historic flooding events, reviews

The 2009 Comprehensive Floodplain Management Plan and Program is intended to be used as a general guide for future decision-making in District activities. The Plan aims to present adequate background information to aid District staff in prioritizing areas for future studies and projects. The Plan identifies historic flooding events, reviews the District's efforts to solve flooding problems, and formulates five-year plans to reduce flooding through flood control project construction, floodplain identification, and planning programs throughout the county.

42040-Thumbnail Image.png
ContributorsThe Pride Publishing Company (Publisher)
Created1996-12
Description

The Groundwater Cleanup Task Force has examined various aspects of Arizona's cleanup programs as well as similar programs in other states and on the federal level. Its members have debated these issues in detail, and present this report as a summary of the Task Force's work and recommendations.

42259-Thumbnail Image.png
Created2013-11-25
Description

The objective of this Technical Data Notebook is to provide 100-yr peak discharges at a Concentration Point for the Unnamed 02 and 03 Washes, 100-yr floodplain boundary and erosion hazard information, using the most up-to-date topographic, hydrologic, and hydraulic data. This is a local study and has not been submitted

The objective of this Technical Data Notebook is to provide 100-yr peak discharges at a Concentration Point for the Unnamed 02 and 03 Washes, 100-yr floodplain boundary and erosion hazard information, using the most up-to-date topographic, hydrologic, and hydraulic data. This is a local study and has not been submitted to FEMA.

42731-Thumbnail Image.png
Created2000-10
Description

This memorandum describes (1) the potential applicability to Pima County of a national initiative to institute reforms in floodplain management; and (2) an assessment of the effectiveness of Pima County's Riparian Habitat Mitigation Ordinance (attachment). An inter-departmental team was formed to formulate specific proposals for consideration as part of the

This memorandum describes (1) the potential applicability to Pima County of a national initiative to institute reforms in floodplain management; and (2) an assessment of the effectiveness of Pima County's Riparian Habitat Mitigation Ordinance (attachment). An inter-departmental team was formed to formulate specific proposals for consideration as part of the Riparian Protection Element of the SDCP and the major plan amendment to the County's comprehensive plan.

42859-Thumbnail Image.png
Created2010
Description

The District's Coordinated, Comprehensive, Collaborative Flood Hazard Mitigation Partnering (C3FHMP) effort addressed Strategic Initiative No.3 of the Flood Control District of Maricopa County 2009 Comprehensive Plan: Increase Collaboration and Partnerships. The District initiated the process to determine how the funding and resources of other entities could be best applied to

The District's Coordinated, Comprehensive, Collaborative Flood Hazard Mitigation Partnering (C3FHMP) effort addressed Strategic Initiative No.3 of the Flood Control District of Maricopa County 2009 Comprehensive Plan: Increase Collaboration and Partnerships. The District initiated the process to determine how the funding and resources of other entities could be best applied to mitigate flood hazards in Maricopa County, or where mutual benefits would be realized.

42401-Thumbnail Image.png
Created2009-01-11
Description

The purpose of the Flood Response Plan is to reduce the potential for property damage and loss of life resulting from floods on the Beaver Dam Wash at the community of Beaver Dam. This report is intentionally short and concise to make it easily usable during a flood emergency.

42400-Thumbnail Image.png
ContributorsArizona. Governor's Drought Task Force (Contributor)
Created2007-12-06
Description

This study is intended to assess flood risk, and identify flood hazards based on those risks, for the Beaver Dam area from the Beaver Dam Wash. The hydrologic and hydraulic results are intended for risk assessment and emergency management purposes only. The results of this study should not be considered

This study is intended to assess flood risk, and identify flood hazards based on those risks, for the Beaver Dam area from the Beaver Dam Wash. The hydrologic and hydraulic results are intended for risk assessment and emergency management purposes only. The results of this study should not be considered as “best available technical information” for floodplain management purposes.”

42362-Thumbnail Image.png
ContributorsNelson, James H. (Author) / Pearthree, Marie Slezak (Author of afterword, colophon, etc.) / The Pride Publishing Company (Contributor)
Created1983-08-15
Description

This plan has been prepared in recognition of area flooding problems induced by urbanization within this unusually flat portion of the Tucson basin.

42361-Thumbnail Image.png
Created1986-01-28
Description

The Flecha Caida study area encompasses approximately eight square miles of the foothill region of the Santa Catalina Mountains. The three major washes studied include Finger Rock Wash, Valley View Wash, and Flecha Caida Wash. One tributary (Sky Club Wash) to the Valley View Wash and three tributaries to the

The Flecha Caida study area encompasses approximately eight square miles of the foothill region of the Santa Catalina Mountains. The three major washes studied include Finger Rock Wash, Valley View Wash, and Flecha Caida Wash. One tributary (Sky Club Wash) to the Valley View Wash and three tributaries to the Finger Rock Wash were also included in this study.