Filtering by
- All Subjects: Flood control
- All Subjects: Consulate General of China
- Resource Type: Text
Offsite drainage impacts the project site from several watersheds whose headwaters lie to the northeast of the project site. This report will address the manner in which the existing offsite and the post-development onsite drainage will be conveyed across this project.
This request for a Physical Map Revision is for a reach of Camino de Oeste Wash from Foret Road to Camino De Oeste Road. This PMR is to reflect improved topographical data available subsequent to the Flood Insurance Study of this area, and to establish base flood elevations for the floodplain.
The purpose of the Phase I study is to evaluate existing drainage conditions and to identify alternative flood control/floodplain management strategies which warrant further consideration.
The purpose of this study is to develop a physical, process-based hydrologic model for the Finger Rock Wash watershed. A HEC-1 model was developed to estimate the 100-year discharge rate.
Work maps for the Mission Wash floodplain. Highlighted photographs show the floodplain limits and watersheds.
This study was developed to identify the resources and applicable methodology for the delineation of primary flood corridors.
The purpose of this study is to determine the hydrologic and hydraulic impacts of the Aspen Fire of the summer of 2003 on the Sabino Canyon and Carter Canyon watersheds, which are in the vicinity of the Town of Summerhaven, located on Mount Lemmon in the Santa Catalina Mountains, Arizona.
The purpose of this study is to provide uniformity in how building permits are processed and development is regulated within sheet flood areas in order to ensure that improvements are adequately protected from flood hazards.
This report documents the existing drainage conditions related to Silverbell Trails Estates roadways and 100-year flow depths and includes qualitative and quantitative analyses of the existing hydrologic and hydraulic conditions.