Matching Items (18)
Filtering by

Clear all filters

Created1994-04-29
Description

Phase IIA focuses on identifying alternatives for mitigating the hazards and problems, evaluating the alternatives for flood mitigation potential and cost effectiveness, and recommending a preferred alternative and flood control policy.

Created2010-04-30
Description

This study is to update the current plan entitled "Unified Nogales/Santa Cruz County Transportation 2000 Plan." The local governments need a fresh look and new approach to developing their transportation plan. Purpose: The purpose of this study is to create a useful, workable transportation system planning document that contains a

This study is to update the current plan entitled "Unified Nogales/Santa Cruz County Transportation 2000 Plan." The local governments need a fresh look and new approach to developing their transportation plan. Purpose: The purpose of this study is to create a useful, workable transportation system planning document that contains a realistic and achievable program for implementing transportation system improvements throughout the city and the county.

42036-Thumbnail Image.png
Created2009-04
Description

Landscaping planted after January 1, 1987 within publicly owned rights-of-way and irrigated with groundwater may be planted only with plants listed on the ADWR Low Water Use/ Drought Tolerant Plant List for the Tucson AMA. The director may waive this requirement under special circumstances. This list can also be used

Landscaping planted after January 1, 1987 within publicly owned rights-of-way and irrigated with groundwater may be planted only with plants listed on the ADWR Low Water Use/ Drought Tolerant Plant List for the Tucson AMA. The director may waive this requirement under special circumstances. This list can also be used as a resource for residents and businesses that are interested in conserving water. The list provides a wide array of plants to accomplish a variety of low wateruse landscape designs.

43222-Thumbnail Image.png
Created2009-11
Description

This report summarizes the results of an economic impact analysis of the Rosemont Copper Project, an open-pit mining operation to be developed on a 15,000 acre site in Pima County about 30 miles southeast of Tucson. The analysis employed the REMI PI+ regional economic forecasting model to estimate the economic

This report summarizes the results of an economic impact analysis of the Rosemont Copper Project, an open-pit mining operation to be developed on a 15,000 acre site in Pima County about 30 miles southeast of Tucson. The analysis employed the REMI PI+ regional economic forecasting model to estimate the economic impacts of the Project for the Cochise/Pima County/Santa Cruz Counties study area, for the State of Arizona, and for the United States.

Created1990-07
Description

The purpose of this study, which represents Phase I, is to determine long range planning and land use policies for flood control and floodplain management in the southwest area.

42347-Thumbnail Image.png
Created1990-09-12
Description

The purpose of this report is to assist the Pima County Board of Supervisors in assessing whether the Black Wash area requires area-specific flood control policies.

42346-Thumbnail Image.png
Created1994-10
Description

The purpose of this study is to revise the existing Flood Insurance Study and Flood Insurance Rate Maps for a portion of the Canada del Oro Wash. This information will be used by Pima County to update existing flood plain information.

42343-Thumbnail Image.png
Created1992-09
Description

The study developed the 100-year floodplain limits within the watershed and identified the area between Westover Avenue and Valencia Road as a major flood hazard area affecting most of the properties along the channel.

42339-Thumbnail Image.png
Created1993-08-03
Description

This plan has focused on two program areas: 1) floodplain management through revised floodplain delineations and assessment of subsequent FEMA mapping revisions; and 2) basin-wide planning issues involving both short- and long-term drainage infrastructure and regulatory needs.

42330-Thumbnail Image.png
Created1987 to 1989
Description

Offsite drainage impacts the project site from several watersheds whose headwaters lie to the northeast of the project site. This report will address the manner in which the existing offsite and the post-development onsite drainage will be conveyed across this project.