Matching Items (1,032)
Filtering by

Clear all filters

42012-Thumbnail Image.png
Created2015-06
Description

As part of the Long Term Pavement Performance (LTPP) Program, the Arizona Department of Transportation constructed eight Specific Pavement Studies 9 (SPS‐9) test sections on Interstate 10 near Phoenix is an overlay project and is accordingly given independent analysis and documentation in this report separate from Arizona SPS‐9B projects located

As part of the Long Term Pavement Performance (LTPP) Program, the Arizona Department of Transportation constructed eight Specific Pavement Studies 9 (SPS‐9) test sections on Interstate 10 near Phoenix is an overlay project and is accordingly given independent analysis and documentation in this report separate from Arizona SPS‐9B projects located on US 93, which were new construction and are documented in a separate report. The SPS‐9A project studied the effect of asphalt specification and mix designs on flexible pavements, specifically comparing Superpave binders with commonly used agency binders. Opened to traffic in 1995, the project was monitored at regular intervals until it was rehabilitated in 2005. Surface distress, profile, and deflection data collected throughout the life of the pavement were used to evaluate the performance of various flexible pavement design features, layer configurations, and thickness. This report documents the analyses conducted as well as practical findings and lessons learned that will be of interest to ADOT.

43596-Thumbnail Image.png
Created2012-02
Description

As part of the Long Term Pavement Performance (LTPP) Program, Arizona DOT constructed 16 SPS-1 test sections on U.S. Route 93 near Kingman. The SPS-1 study was designed to study a variety of structural sections in new asphalt concrete construction. Opened to traffic in 1993, the project was monitored at

As part of the Long Term Pavement Performance (LTPP) Program, Arizona DOT constructed 16 SPS-1 test sections on U.S. Route 93 near Kingman. The SPS-1 study was designed to study a variety of structural sections in new asphalt concrete construction. Opened to traffic in 1993, the project was monitored at regular intervals until it was rehabilitated in 2006. Surface distress, profile, and deflection data collected throughout the life of the pavement were used to evaluate the performance of various flexible pavement design features, layer configurations, and thickness. This report documents the analyses conducted as well as practical findings and lessons learned that will be of interest to Arizona DOT.

78254-Thumbnail Image.png
Created1861
Description

Records for the ship Carmelita, which brought Chinese settlers from China to Cuba under contract with Rita Barbarca a la Lara. On this trip, Carmelita brought settlers from China to work in Matanzas.

78255-Thumbnail Image.png
Created1860
Description

Shipping records for the ship, the Carmelita, which brought Chinese settlers from China to Cuba. The Carmelita has fulfilled its contract for the shipment of these settlers on the 30th of October, 1852. These settlers were to be contracted by other employers.

77800-Thumbnail Image.png
Created1861
DescriptionDocuments pertaining to the hiring of Chinese settlers by the sugar factory, Carmelita, owned by Rita Barbaria de Lara.
77798-Thumbnail Image.png
Created1870
DescriptionPayment records of Gonzales y Compania in Matanzas, detailing the total amount of money owed as payment to their employed Chinese settlers.
78470-Thumbnail Image.png
Created1874
Description
A contract between Judas, a Chinese settler, and Manuel Bello. The contract was to last for six months and lists the legal requirements of both the employee and the employer. Noted that Judas completed a contract with Manuel Bello previously. Signed by Manuel Bello, Jose Lopez Francais, and Judas, who

A contract between Judas, a Chinese settler, and Manuel Bello. The contract was to last for six months and lists the legal requirements of both the employee and the employer. Noted that Judas completed a contract with Manuel Bello previously. Signed by Manuel Bello, Jose Lopez Francais, and Judas, who signed in Chinese.
79043-Thumbnail Image.png
Created1880
DescriptionAn identity card, or cedula, for Agustin Afon. Agustin was 33 years old when this card was issued.
78635-Thumbnail Image.png
Created1865-03-15
Description
This is a list of sixty Chinese settlers whose eight year labor contracts were transferred to Banco de San Carlos upon their arrival in Havana. The settlers were transported to Cuba aboard the Spanish ship "Emigrante", and they were required to work as indentured servants for eight years. These settlers

This is a list of sixty Chinese settlers whose eight year labor contracts were transferred to Banco de San Carlos upon their arrival in Havana. The settlers were transported to Cuba aboard the Spanish ship "Emigrante", and they were required to work as indentured servants for eight years. These settlers were hired by the bank to do fieldwork in Matanzas, Cuba. 1865.
78296-Thumbnail Image.png
Created1865-03-24
Description

Records for the ship Encarnacion, which brought Chinese settlers from China to Cuba under contract with Marino Gillado. On this trip, the Encarnacion brought settlers from China to work for Arrengui Ganz.