Filtering by
- All Subjects: Cave Creek (Ariz.)
- All Subjects: Rural transportation
- Creators: Battelle Memorial Institute. Technology Partnership Practice
This document has been prepared to fulfill the requirements for a hydraulic study for the Cave Creek Landfill operated by Maricopa County.
This circulation study has developed transportation improvements for all transportation modes including automobile, transit, bicycle, pedestrian, and equestrian transportation. Although bicycle and equestrian travel is not common on the East Reservation, projects were developed to encourage future use of these modes of travel. The plan recommends transportation improvements for 5, 10, and 20 year planning horizons
This study identifies a plan of improvements for vehicular, transit, and nonmotorized transportation and outlines the specific actions necessary to implement and sustain the plan. The recommendations for these elements are based on technical analyses of existing and future conditions as well as stakeholder and public input. The Study identifies projects that establish and improve multimodal options for Nation members. The development of these suggested projects includes consideration of evaluation criteria addressing such issues as safety and connection of multimodal transportation modes throughout the Nation and to the greater region. The Study projects will be included in the Nation’s Long-Range Transportation Plan, which provides the vision for meeting the community’s transportation needs over a 20-year planning horizon.
This study evaluates the feasibility of, and provides recommendations for public transportation service for the Fort Mojave Indian Reservation and surrounding area.
The purpose of the Verde Valley Multimodal Transportation Study is to develop a long-range regional transportation plan to guide the implementation of transportation improvements on the roads of regional significance in the Verde Valley, including I-17, State Routes, and roads on the County Regional Road System. This Study is an update of the 1999 Verde Valley Transportation Study Update.
This addendum to the 2005 work plan identifies how additional assessment of groundwater features and contamination at Cave Creek Landfill will be conducted.
This Additional Site Characterization Work Plan presents a strategy for collecting site characterization information at the closed Maricopa County Cave Creek Landfill to support ongoing remedial action planning for trichloroethene-impacted groundwater underlying the site. The Work Plan supplements previous remedial investigation work plans prepared to characterize the nature and extent of site contamination.
This monitor well completion report was prepared to document the construction and installation of monitor well MW-3, located on the southeast side of Black Mountain Parkway. It was installed to provide long-term ground-water monitoring.
To evaluate whether VOCs are migrating out of the landfills into the vadose zone, a soil vapor survey of the soil beneath the landfill bases was performed. Permanent vapor monitoring probes were installed and then sampled twice for VOCs. Groundwater beneath the landfills has been impactd by VOCs, namely TCE, DCE, and toluene.
During the period of 1965 through 1984, Maricopa County operated a landfill leased from the U.S. Bureau of Land Management. In 1982 the County leased a separate parcel from the State for the development of a new landfill. The landfill stopped accepting waste in 1998.