Matching Items (15)
Filtering by

Clear all filters

42480-Thumbnail Image.png
Created1993-09-17
Description

This document has been prepared to fulfill the requirements for a hydraulic study for the Cave Creek Landfill operated by Maricopa County.

42481-Thumbnail Image.png
Created2005-08-26
Description

During the period of 1965 through 1984, Maricopa County operated a landfill leased from the U.S. Bureau of Land Management. In 1982 the County leased a separate parcel from the State for the development of a new landfill. The landfill stopped accepting waste in 1998.

42482-Thumbnail Image.png
Created2005-07-08
Description

To evaluate whether VOCs are migrating out of the landfills into the vadose zone, a soil vapor survey of the soil beneath the landfill bases was performed. Permanent vapor monitoring probes were installed and then sampled twice for VOCs. Groundwater beneath the landfills has been impactd by VOCs, namely TCE,

To evaluate whether VOCs are migrating out of the landfills into the vadose zone, a soil vapor survey of the soil beneath the landfill bases was performed. Permanent vapor monitoring probes were installed and then sampled twice for VOCs. Groundwater beneath the landfills has been impactd by VOCs, namely TCE, DCE, and toluene.

42483-Thumbnail Image.png
Created2008-01
Description

This monitor well completion report was prepared to document the construction and installation of monitor well MW-3, located on the southeast side of Black Mountain Parkway. It was installed to provide long-term ground-water monitoring.

42484-Thumbnail Image.png
Created2012-11-19
Description

This Additional Site Characterization Work Plan presents a strategy for collecting site characterization information at the closed Maricopa County Cave Creek Landfill to support ongoing remedial action planning for trichloroethene-impacted groundwater underlying the site. The Work Plan supplements previous remedial investigation work plans prepared to characterize the nature and extent

This Additional Site Characterization Work Plan presents a strategy for collecting site characterization information at the closed Maricopa County Cave Creek Landfill to support ongoing remedial action planning for trichloroethene-impacted groundwater underlying the site. The Work Plan supplements previous remedial investigation work plans prepared to characterize the nature and extent of site contamination.

90851-Thumbnail Image.jpg
ContributorsSoleri, Paolo, 1919-2013 (Architect)
Created1972-10
Description

Photograph of a garden and wooden structures at Construction Camp, Arcosanti

90865-Thumbnail Image.jpg
ContributorsSoleri, Paolo, 1919-2013 (Associated name)
Created1972-10
Description

Photograph of a garden and wooden fence at Construction Camp, Arcosanti

42011-Thumbnail Image.png
Created2009-05-11
Description

This addendum to the 2005 work plan identifies how additional assessment of groundwater features and contamination at Cave Creek Landfill will be conducted.

Created2011-08
Description

The Arizona Department of Transportation, through the Planning Assistance for Rural Areas (PARA) program, awarded funding for the City of Sierra Vista Safe Bicycle and Pedestrian Routes Plan. Improving bicycle and pedestrian safety has many benefits to the city of Sierra Vista and its residents. Improving and providing safe bicycle

The Arizona Department of Transportation, through the Planning Assistance for Rural Areas (PARA) program, awarded funding for the City of Sierra Vista Safe Bicycle and Pedestrian Routes Plan. Improving bicycle and pedestrian safety has many benefits to the city of Sierra Vista and its residents. Improving and providing safe bicycle and pedestrian facilities provides a viable transportation option for those people who cannot or do not drive. In addition, it is anticipated that development of a network of safe bicycle and pedestrian routes will increase the number of bicycle and pedestrian trips, thus reducing reliance on personal vehicles.

43633-Thumbnail Image.png
Created2007-01-30
Description

This document provides a summary of activities completed in support of Phase III of the Arizona Statewide Bicycle and Pedestrian Program. The purpose of Phase III was to implement recommendations from the Arizona Statewide Bicycle and Pedestrian Plan Phase I and Phase II.