This document has been prepared to fulfill the requirements for a hydraulic study for the Cave Creek Landfill operated by Maricopa County.
During the period of 1965 through 1984, Maricopa County operated a landfill leased from the U.S. Bureau of Land Management. In 1982 the County leased a separate parcel from the State for the development of a new landfill. The landfill stopped accepting waste in 1998.
To evaluate whether VOCs are migrating out of the landfills into the vadose zone, a soil vapor survey of the soil beneath the landfill bases was performed. Permanent vapor monitoring probes were installed and then sampled twice for VOCs. Groundwater beneath the landfills has been impactd by VOCs, namely TCE, DCE, and toluene.
This Additional Site Characterization Work Plan presents a strategy for collecting site characterization information at the closed Maricopa County Cave Creek Landfill to support ongoing remedial action planning for trichloroethene-impacted groundwater underlying the site. The Work Plan supplements previous remedial investigation work plans prepared to characterize the nature and extent of site contamination.
Phase IIA focuses on identifying alternatives for mitigating the hazards and problems, evaluating the alternatives for flood mitigation potential and cost effectiveness, and recommending a preferred alternative and flood control policy.
This plan has focused on two program areas: 1) floodplain management through revised floodplain delineations and assessment of subsequent FEMA mapping revisions; and 2) basin-wide planning issues involving both short- and long-term drainage infrastructure and regulatory needs.
The study developed the 100-year floodplain limits within the watershed and identified the area between Westover Avenue and Valencia Road as a major flood hazard area affecting most of the properties along the channel.
The purpose of this study, which represents Phase I, is to determine long range planning and land use policies for flood control and floodplain management in the southwest area.
Pima County's Cienega Creek Natural Preserve surface water and groundwater monitoring project. This report summaries PAG's groundwater and surface water monitoring between July and June each fiscal/ monitoring year. The report contains monitoring methodology, comprehensive maps, and graphs of trends for surface flow volume, wet-dry flow lengths, groundwater levels and water chemistry. It also contains information on drought, erosion and repeat photography.
The purpose of Phase I of the Riverside Terrace Basin management plan is the assessment of the existing hydrologic and basic hydraulic properties of the watershed.