Matching Items (18)
Filtering by

Clear all filters

42480-Thumbnail Image.png
Created1993-09-17
Description

This document has been prepared to fulfill the requirements for a hydraulic study for the Cave Creek Landfill operated by Maricopa County.

42481-Thumbnail Image.png
Created2005-08-26
Description

During the period of 1965 through 1984, Maricopa County operated a landfill leased from the U.S. Bureau of Land Management. In 1982 the County leased a separate parcel from the State for the development of a new landfill. The landfill stopped accepting waste in 1998.

42482-Thumbnail Image.png
Created2005-07-08
Description

To evaluate whether VOCs are migrating out of the landfills into the vadose zone, a soil vapor survey of the soil beneath the landfill bases was performed. Permanent vapor monitoring probes were installed and then sampled twice for VOCs. Groundwater beneath the landfills has been impactd by VOCs, namely TCE,

To evaluate whether VOCs are migrating out of the landfills into the vadose zone, a soil vapor survey of the soil beneath the landfill bases was performed. Permanent vapor monitoring probes were installed and then sampled twice for VOCs. Groundwater beneath the landfills has been impactd by VOCs, namely TCE, DCE, and toluene.

42484-Thumbnail Image.png
Created2012-11-19
Description

This Additional Site Characterization Work Plan presents a strategy for collecting site characterization information at the closed Maricopa County Cave Creek Landfill to support ongoing remedial action planning for trichloroethene-impacted groundwater underlying the site. The Work Plan supplements previous remedial investigation work plans prepared to characterize the nature and extent

This Additional Site Characterization Work Plan presents a strategy for collecting site characterization information at the closed Maricopa County Cave Creek Landfill to support ongoing remedial action planning for trichloroethene-impacted groundwater underlying the site. The Work Plan supplements previous remedial investigation work plans prepared to characterize the nature and extent of site contamination.

43005-Thumbnail Image.png
Created2005-02-24
Description

The collaborative process for developing the Tusayan Community Wildfire Protection Plan began May 5, 2004 at a Tusayan/Grand Canyon Chamber of Commerce Board meeting in Tusayan. A CWPP is developed to assist local fire districts, local governmental agencies and residents in the identification of lands—including federal lands—at risk from severe

The collaborative process for developing the Tusayan Community Wildfire Protection Plan began May 5, 2004 at a Tusayan/Grand Canyon Chamber of Commerce Board meeting in Tusayan. A CWPP is developed to assist local fire districts, local governmental agencies and residents in the identification of lands—including federal lands—at risk from severe wildfire threat and to identify strategies for reducing fuels on wildlands while improving forest health, supporting local economies, and improving firefighting response capabilities.

43007-Thumbnail Image.png
Created2005-01
Description

The wild land/urban interface is a concern in Coconino County because of the potential for wild land fuels to ignite combustible structures and vice-versa. Destroying homes, property, and trees is just one way that wildfire harms an area. Wildfires can destroy habitat, soils, and forest health, disrupting economic stability, transportation

The wild land/urban interface is a concern in Coconino County because of the potential for wild land fuels to ignite combustible structures and vice-versa. Destroying homes, property, and trees is just one way that wildfire harms an area. Wildfires can destroy habitat, soils, and forest health, disrupting economic stability, transportation corridors, recreation opportunities, water supplies, and scenery, as well as undermining a community’s emotional and spiritual well-being. Reducing the threat of catastrophic wildfire is a priority in the wild land/urban interface. This plan outlines actions needed to prepare and equip the greater Flagstaff community to live and thrive within our fire-adapted ponderosa pine forests.

42540-Thumbnail Image.png
Created2013-11
Description

19 members of the Granite Mountain Interagency Hotshot Crew died after being entrapped and burned over on the Yarnell Hill Fire in Yarnell, Arizona. The purpose of this document is to provide:
* A timeline of events that occurred between the time of ignition on June 28 and the entrapment and

19 members of the Granite Mountain Interagency Hotshot Crew died after being entrapped and burned over on the Yarnell Hill Fire in Yarnell, Arizona. The purpose of this document is to provide:
* A timeline of events that occurred between the time of ignition on June 28 and the entrapment and burnover on June 30;
* An analysis of the fire behavior and fire weather on June 30;
* A discussion of overhead management, strategies and tactics used on the fire, and documentation of decision points leading up to the entrapment and burnover that claimed the lives of the firefighters.

Created2004 to 2013
Description

A majority of the work performed by ADEQ's Nonpoint Source Program is funded by Clean Water Act grants, awarded by the U.S. Environmental Protection Agency which requires States to report annually on progress in meeting the schedule of milestones contained in their nonpoint source management plans, and report reductions in

A majority of the work performed by ADEQ's Nonpoint Source Program is funded by Clean Water Act grants, awarded by the U.S. Environmental Protection Agency which requires States to report annually on progress in meeting the schedule of milestones contained in their nonpoint source management plans, and report reductions in nonpoint source pollutant loadings and improvement in water quality resulting from program implementation.

Created2010 to 2011
Description

Pima County's Cienega Creek Natural Preserve surface water and groundwater monitoring project. This report summaries PAG's groundwater and surface water monitoring between July and June each fiscal/ monitoring year. The report contains monitoring methodology, comprehensive maps, and graphs of trends for surface flow volume, wet-dry flow lengths, groundwater levels and

Pima County's Cienega Creek Natural Preserve surface water and groundwater monitoring project. This report summaries PAG's groundwater and surface water monitoring between July and June each fiscal/ monitoring year. The report contains monitoring methodology, comprehensive maps, and graphs of trends for surface flow volume, wet-dry flow lengths, groundwater levels and water chemistry. It also contains information on drought, erosion and repeat photography.

42364-Thumbnail Image.png
Created2007-03
Description

Pima Association of Governments updated a portion of the Water Usage Along Selected Streams in Pima County, Arizona, which PAG created in 2000. The updated report and datasets show current potential water usage in these critical areas. Deliverables include the shapefiles, spreadsheets and maps that accompany this memorandum. The purpose

Pima Association of Governments updated a portion of the Water Usage Along Selected Streams in Pima County, Arizona, which PAG created in 2000. The updated report and datasets show current potential water usage in these critical areas. Deliverables include the shapefiles, spreadsheets and maps that accompany this memorandum. The purpose of this report is to provide updated information about the location and pumping history of wells located in Pima County near shallow groundwater areas, generally located near drainages.