Matching Items (11)
Filtering by

Clear all filters

Created1994-04-29
Description

Phase IIA focuses on identifying alternatives for mitigating the hazards and problems, evaluating the alternatives for flood mitigation potential and cost effectiveness, and recommending a preferred alternative and flood control policy.

42056-Thumbnail Image.png
Created2015-04
Description

Department is hindered by ineffective information technology leadership processes and should prepare for the planned replacement of its primary IT system.

42000-Thumbnail Image.png
Created2015-09
Description

Department should improve its information technology security, continue developing its information security program, and enhance the physical security of taxpayer information.

41999-Thumbnail Image.png
Created2015-09
Description

This report includes responses to the sunset factors specified in A.R.S. [section]41-2954 and is the final in a series of three reports on the Department.

42727-Thumbnail Image.png
Created2001-02
Description

Concerns research into the origin of water sustaining the Bingham Cienega. For purposes of long term management, we need to understand what the source of water is for the various riparian areas.

42723-Thumbnail Image.png
Created2001-05
Description

Provides basic information about the source of surface water in Cienega Creek at the downstream end of the natural preserve, which will contribute to efforts to conceptualize and implement effective land management proposals for the SDCP. Study results indicate that the surface flow or subflow from Agua Verde Creek do

Provides basic information about the source of surface water in Cienega Creek at the downstream end of the natural preserve, which will contribute to efforts to conceptualize and implement effective land management proposals for the SDCP. Study results indicate that the surface flow or subflow from Agua Verde Creek do not significantly influence the water in the Cienega Creek.

42359-Thumbnail Image.png
Created1986-07
Description

The purpose of this study is to develop a basin management plan for Highlands Wash and the two washes west of Highlands Wash.

42358-Thumbnail Image.png
Created1986-11-17
Description

The purpose of Phase I of the Riverside Terrace Basin management plan is the assessment of the existing hydrologic and basic hydraulic properties of the watershed.

Created1990-07
Description

The purpose of this study, which represents Phase I, is to determine long range planning and land use policies for flood control and floodplain management in the southwest area.

42343-Thumbnail Image.png
Created1992-09
Description

The study developed the 100-year floodplain limits within the watershed and identified the area between Westover Avenue and Valencia Road as a major flood hazard area affecting most of the properties along the channel.