Filtering by
- All Subjects: Education--Finance
- All Subjects: Regional planning
- All Subjects: Cochise County (Ariz.)
- Creators: Battelle Memorial Institute. Technology Partnership Practice
- Creators: Schick, Cherylene
It was decided to revise the 1980 Havasu area study, since the area had changed so much. The members felt that to retain some control over the growth a revised area plan was needed and decided to have the area covered to be just the 72 square miles of the Desert Hills Fire District, rather than the whole of the unincorporated Lake Havasu Area north of the City.
Construction of a habitat restoration project in the Salt River will begin in the spring of 2000 which will transform the riverbed to provide a variety of amenities including recreation opportunities, improved flood management, riparian vegetation and wildlife habitat. The Beyond the Tanks area surrounds the Rio Salado project and is bounded by I-17 to the north, 32nd Street to the east, Broadway Road to the south and 19th Avenue to the west. The committee has adopted the name "Village at Rio Salado" for this area but will be referred to as "Beyond the Banks" in this report.
In fiscal year 2011, Chino Valley Unified School District’s student achievement was similar to peer district and state averages, and its operational efficiencies were mixed with some costs higher and some costs lower than peer districts’ averages. The District’s per-pupil administrative costs were slightly higher than peer districts’ because the District employed more administrative positions per pupil. The District’s plant operations, food service, and transportation programs operated reasonably efficiently, with cost measures such as cost per square foot, cost per meal, and cost per mile that were similar to or lower than peer districts’ averages. However, the District needs to improve controls over access to critical information systems and strengthen controls over its fuel purchase cards.
The Graham County, Safford, Thatcher, Pima Small Area Transportation Study was initiated by Graham County, in conjunction with the Arizona Department of Transportation, to develop a countywide, long-range multimodal transportation plan for this growing rural Arizona community. The project sponsors selected the PB Americas team to conduct this study under the direction of a Technical Advisory Committee, which included representatives from Graham County, City of Safford, Town of Thatcher, Town of Pima, Southeastern Arizona Governments Organization, and ADOT.
In 1992, Graham County conducted a transportation study for the Gila Valley Region. This study prepared a long-range transportation plan and a transportation improvement program. Many of the improvements have been completed. The purpose of this study is to update the 1992 transportation plan and to address the current issues within the area.
In fiscal year 2011, Patagonia ESD’s student AIMS scores in math and reading were lower than peer districts’ averages, and its writing scores were higher. Patagonia UHSD’s scores were higher in all three subject areas than peer districts’, on average. Because the two districts operate essentially as one district, auditors considered their operations combined when determining operational efficiency. The districts saved money by operating together but could do more to further reduce costs. The combined District’s cost-efficiency in noninstructional areas was mixed, with some costs higher and some costs lower than peer districts’, on average. However, the District needs to strengthen controls over multiple operational areas, including payroll and accounts payable processing and computer system access and security. The District also needs to improve bus preventative maintenance, ensure bus driver certification requirements are met, and better control fuel inventory.
The Yuma Regional Transit Study identifies transit needs within southwestern Yuma County and presents recommended transit system improvements based on three funding scenarios. This study examined current and projected population, demographics, and employment for the region, conducted extensive public outreach and data collection, identified transit deficiencies and developed recommended transit improvements based on the identified deficiencies.
This plan responds to key trends, emerging issues, and community visions and goals. The Plan includes strategies and actions for the years 2020 and 2040 to address identified transportation needs, while being sensitive to possible future funding constraints. This Final Report provides an overview of both the study effort and the work products developed throughout the planning process, which forms the basis for the final plan recommendations. The planning process analyzed the existing transportation system, land use and socioeconomic conditions within the study area; conducted in-depth local stakeholder interviews; developed future growth projections; provided opportunities for public input; and included an evaluation of alternative future solutions.
This Land Use Survey, conducted for the Cochise County Planning Department, was designed to elicit citizen opinions about the future pattern of growth in Cochise County and land use issues in areas outside of City limits. This project is an initial step in the County’s "Envision 2020: Land Use Planning in Cochise County" process, developed to measure citizen opinions on how growth is currently managed in the County and how to manage future growth.
The Cochise County Airport is playing an increasing role in the promotion and development of the City of Willcox and the Cochise County area. The master plan has a capital improvement program that responds to the needs and desires for the short and long term aviation forecasts for Cochise County.