Matching Items (51)
Filtering by

Clear all filters

42410-Thumbnail Image.png
Created2009-06
Description

It was decided to revise the 1980 Havasu area study, since the area had changed so much. The members felt that to retain some control over the growth a revised area plan was needed and decided to have the area covered to be just the 72 square miles of the

It was decided to revise the 1980 Havasu area study, since the area had changed so much. The members felt that to retain some control over the growth a revised area plan was needed and decided to have the area covered to be just the 72 square miles of the Desert Hills Fire District, rather than the whole of the unincorporated Lake Havasu Area north of the City.

42441-Thumbnail Image.png
Created2011-03
Description

Scottsdale Road and Rural Road are identified in the Regional Transportation Plan as an arterial Bus Rapid Transit route. The portion of this route within Scottsdale is programmed and funded in the Transit Life Cycle Program.

42480-Thumbnail Image.png
Created1993-09-17
Description

This document has been prepared to fulfill the requirements for a hydraulic study for the Cave Creek Landfill operated by Maricopa County.

42481-Thumbnail Image.png
Created2005-08-26
Description

During the period of 1965 through 1984, Maricopa County operated a landfill leased from the U.S. Bureau of Land Management. In 1982 the County leased a separate parcel from the State for the development of a new landfill. The landfill stopped accepting waste in 1998.

42482-Thumbnail Image.png
Created2005-07-08
Description

To evaluate whether VOCs are migrating out of the landfills into the vadose zone, a soil vapor survey of the soil beneath the landfill bases was performed. Permanent vapor monitoring probes were installed and then sampled twice for VOCs. Groundwater beneath the landfills has been impactd by VOCs, namely TCE,

To evaluate whether VOCs are migrating out of the landfills into the vadose zone, a soil vapor survey of the soil beneath the landfill bases was performed. Permanent vapor monitoring probes were installed and then sampled twice for VOCs. Groundwater beneath the landfills has been impactd by VOCs, namely TCE, DCE, and toluene.

42484-Thumbnail Image.png
Created2012-11-19
Description

This Additional Site Characterization Work Plan presents a strategy for collecting site characterization information at the closed Maricopa County Cave Creek Landfill to support ongoing remedial action planning for trichloroethene-impacted groundwater underlying the site. The Work Plan supplements previous remedial investigation work plans prepared to characterize the nature and extent

This Additional Site Characterization Work Plan presents a strategy for collecting site characterization information at the closed Maricopa County Cave Creek Landfill to support ongoing remedial action planning for trichloroethene-impacted groundwater underlying the site. The Work Plan supplements previous remedial investigation work plans prepared to characterize the nature and extent of site contamination.

Created1996 to 2007
Description

This report was commissioned by the City of Scottsdale and conducted by Behavior Research Center. The purpose of the study was to measure attitudes about the use of photo-based traffic enforcement statewide.

42501-Thumbnail Image.png
Created1999-10
Description

Construction of a habitat restoration project in the Salt River will begin in the spring of 2000 which will transform the riverbed to provide a variety of amenities including recreation opportunities, improved flood management, riparian vegetation and wildlife habitat. The Beyond the Tanks area surrounds the Rio Salado project and

Construction of a habitat restoration project in the Salt River will begin in the spring of 2000 which will transform the riverbed to provide a variety of amenities including recreation opportunities, improved flood management, riparian vegetation and wildlife habitat. The Beyond the Tanks area surrounds the Rio Salado project and is bounded by I-17 to the north, 32nd Street to the east, Broadway Road to the south and 19th Avenue to the west. The committee has adopted the name "Village at Rio Salado" for this area but will be referred to as "Beyond the Banks" in this report.

42982-Thumbnail Image.png
Created2013-06
Description

In fiscal year 2011, Chino Valley Unified School District’s student achievement was similar to peer district and state averages, and its operational efficiencies were mixed with some costs higher and some costs lower than peer districts’ averages. The District’s per-pupil administrative costs were slightly higher than peer districts’ because the

In fiscal year 2011, Chino Valley Unified School District’s student achievement was similar to peer district and state averages, and its operational efficiencies were mixed with some costs higher and some costs lower than peer districts’ averages. The District’s per-pupil administrative costs were slightly higher than peer districts’ because the District employed more administrative positions per pupil. The District’s plant operations, food service, and transportation programs operated reasonably efficiently, with cost measures such as cost per square foot, cost per meal, and cost per mile that were similar to or lower than peer districts’ averages. However, the District needs to improve controls over access to critical information systems and strengthen controls over its fuel purchase cards.

42937-Thumbnail Image.png
Created2009-07-31
Description

The Graham County, Safford, Thatcher, Pima Small Area Transportation Study was initiated by Graham County, in conjunction with the Arizona Department of Transportation, to develop a countywide, long-range multimodal transportation plan for this growing rural Arizona community. The project sponsors selected the PB Americas team to conduct this study under

The Graham County, Safford, Thatcher, Pima Small Area Transportation Study was initiated by Graham County, in conjunction with the Arizona Department of Transportation, to develop a countywide, long-range multimodal transportation plan for this growing rural Arizona community. The project sponsors selected the PB Americas team to conduct this study under the direction of a Technical Advisory Committee, which included representatives from Graham County, City of Safford, Town of Thatcher, Town of Pima, Southeastern Arizona Governments Organization, and ADOT.