Matching Items (6)
Filtering by

Clear all filters

Created2004 to 2016
Description

This inventory includes emissions of coarse particulate matter <10 µm in diameter (PM10), fine particulate matter < 2.5 µm (PM2.5), nitrogen oxides, sulfur oxides, and ammonia. Emissions are calculated for both Maricopa County and the PM10 nonattaiment area. Annual totals as well as typical daily emissions are provided for all

This inventory includes emissions of coarse particulate matter <10 µm in diameter (PM10), fine particulate matter < 2.5 µm (PM2.5), nitrogen oxides, sulfur oxides, and ammonia. Emissions are calculated for both Maricopa County and the PM10 nonattaiment area. Annual totals as well as typical daily emissions are provided for all source categories.

Created2014-03-14
Description

The Arizona Department of Transportation, in coordination with Apache County District II and the Fort Defiance Chapter of the Navajo Nation, analyzed the traffic circulation conditions of Navajo Routes 7, 12, 54, 110, and 112 within the Fort Defiance Industrial Area which is designated as a major growth area on

The Arizona Department of Transportation, in coordination with Apache County District II and the Fort Defiance Chapter of the Navajo Nation, analyzed the traffic circulation conditions of Navajo Routes 7, 12, 54, 110, and 112 within the Fort Defiance Industrial Area which is designated as a major growth area on the Navajo Nation. The study was funded by the Federal Highway Administration’s State Planning and Research Program and administered through ADOT’s Multimodal Planning Division's Planning Assistance for Rural Areas (PARA) program. The study was initiated to develop a planning strategy to improve the mobility and safety within the Fort Defiance Industrial Area.

Created2008-08
Description

Information on the efforts of the Ambos Nogales Air Task Force as part of the Border 2012: U.S.-Mexico Environmental Program to improve environmental quality in the area along the Arizona Sonora border.

Created2011-06
Description

The primary purpose of this study is to determine what transportation improvements would be needed to accommodate future growth and development of the Raytheon Missile Systems facility located south of Tucson International Airport on Hermans Road. A secondary purpose of this study is to consider longer-term roadway and transit improvements

The primary purpose of this study is to determine what transportation improvements would be needed to accommodate future growth and development of the Raytheon Missile Systems facility located south of Tucson International Airport on Hermans Road. A secondary purpose of this study is to consider longer-term roadway and transit improvements that will improve access to Tucson International Airport and associated airport property planned for future development. Specifically, the study analyzed the effects of closing Hughes Access Road/Alvernon Way to non-Raytheon traffic and recommends alternative roadway improvements that would be needed to accommodate this closure.

Created2005 to 2007
Description

In September 2004, ADOT awarded a contract for the Pinal County Corridors Definition Study to Kimley-Horn and Associates. The scope of the Pinal County Corridors Definition Study included the following activities:
* Confirm the need for the East Valley and the North-South corridors;
* Define planning-level corridor definition alternatives;
* Perform a technical

In September 2004, ADOT awarded a contract for the Pinal County Corridors Definition Study to Kimley-Horn and Associates. The scope of the Pinal County Corridors Definition Study included the following activities:
* Confirm the need for the East Valley and the North-South corridors;
* Define planning-level corridor definition alternatives;
* Perform a technical assessment of engineering, environmental, and land use compatibility constraints opportunities for the planning-level corridor definition alternatives;
* Identify to the extent possible, feasible and preferred planning-level corridor definitions on the basis of the technical evaluation;
* Document planning-level costs of corridor development (including studies, design, construction, and right-of-way costs) for the preferred corridor definitions.

The Pinal County Corridors Definition Study resulted in sufficient detail to provide a basis for the future establishment of geometric roadway alignments and corridor design concepts, the preservation of right-of-way, and the identification of required environmental clearance studies.

43486-Thumbnail Image.png
Created2003-03-05
Description

The Committee selected the following environmental goal: A goal with the purpose of showing continued progress through 2018 by; 1) improving visibility to move days now in the poor/very poor categories up to the fair category, and 2) moving days classified as fair to the good/excellent categories. A progress
assessment will

The Committee selected the following environmental goal: A goal with the purpose of showing continued progress through 2018 by; 1) improving visibility to move days now in the poor/very poor categories up to the fair category, and 2) moving days classified as fair to the good/excellent categories. A progress
assessment will be conducted every 5 years through 2018. The members concluded that this option provides a clear, long term method to track visibility trends in the Phoenix metropolitan area. Additionally, the Committee reached general agreement that the index should not be used to affect short term actions because other programs, such as the High Pollution Advisory Program, are currently in place.