Matching Items (18)
Filtering by

Clear all filters

Created2004 to 2016
Description

This inventory includes emissions of coarse particulate matter <10 µm in diameter (PM10), fine particulate matter < 2.5 µm (PM2.5), nitrogen oxides, sulfur oxides, and ammonia. Emissions are calculated for both Maricopa County and the PM10 nonattaiment area. Annual totals as well as typical daily emissions are provided for all

This inventory includes emissions of coarse particulate matter <10 µm in diameter (PM10), fine particulate matter < 2.5 µm (PM2.5), nitrogen oxides, sulfur oxides, and ammonia. Emissions are calculated for both Maricopa County and the PM10 nonattaiment area. Annual totals as well as typical daily emissions are provided for all source categories.

Created2008-08
Description

Information on the efforts of the Ambos Nogales Air Task Force as part of the Border 2012: U.S.-Mexico Environmental Program to improve environmental quality in the area along the Arizona Sonora border.

Created1994-04-29
Description

Phase IIA focuses on identifying alternatives for mitigating the hazards and problems, evaluating the alternatives for flood mitigation potential and cost effectiveness, and recommending a preferred alternative and flood control policy.

43486-Thumbnail Image.png
Created2003-03-05
Description

The Committee selected the following environmental goal: A goal with the purpose of showing continued progress through 2018 by; 1) improving visibility to move days now in the poor/very poor categories up to the fair category, and 2) moving days classified as fair to the good/excellent categories. A progress
assessment will

The Committee selected the following environmental goal: A goal with the purpose of showing continued progress through 2018 by; 1) improving visibility to move days now in the poor/very poor categories up to the fair category, and 2) moving days classified as fair to the good/excellent categories. A progress
assessment will be conducted every 5 years through 2018. The members concluded that this option provides a clear, long term method to track visibility trends in the Phoenix metropolitan area. Additionally, the Committee reached general agreement that the index should not be used to affect short term actions because other programs, such as the High Pollution Advisory Program, are currently in place.

Created1990-07
Description

The purpose of this study, which represents Phase I, is to determine long range planning and land use policies for flood control and floodplain management in the southwest area.

42347-Thumbnail Image.png
Created1990-09-12
Description

The purpose of this report is to assist the Pima County Board of Supervisors in assessing whether the Black Wash area requires area-specific flood control policies.

42346-Thumbnail Image.png
Created1994-10
Description

The purpose of this study is to revise the existing Flood Insurance Study and Flood Insurance Rate Maps for a portion of the Canada del Oro Wash. This information will be used by Pima County to update existing flood plain information.

42343-Thumbnail Image.png
Created1992-09
Description

The study developed the 100-year floodplain limits within the watershed and identified the area between Westover Avenue and Valencia Road as a major flood hazard area affecting most of the properties along the channel.

42339-Thumbnail Image.png
Created1993-08-03
Description

This plan has focused on two program areas: 1) floodplain management through revised floodplain delineations and assessment of subsequent FEMA mapping revisions; and 2) basin-wide planning issues involving both short- and long-term drainage infrastructure and regulatory needs.

42330-Thumbnail Image.png
Created1987 to 1989
Description

Offsite drainage impacts the project site from several watersheds whose headwaters lie to the northeast of the project site. This report will address the manner in which the existing offsite and the post-development onsite drainage will be conveyed across this project.