Matching Items (13)
Filtering by

Clear all filters

42897-Thumbnail Image.png
Created2013-10
Description

This report addresses (1) expenditures for the recruitment, retention, training, licensing, and tracking of homes maintained by foster parents; (2) an assessment of whether the Department’s contract process of home recruitment, study, and supervision is the most appropriate means to provide these services; and (3) best performance measures to evaluate

This report addresses (1) expenditures for the recruitment, retention, training, licensing, and tracking of homes maintained by foster parents; (2) an assessment of whether the Department’s contract process of home recruitment, study, and supervision is the most appropriate means to provide these services; and (3) best performance measures to evaluate the effectiveness of these services. Although contracting appears to be an appropriate method for obtaining foster home recruitment-related services, the Department should improve how it contracts for these services.

42325-Thumbnail Image.png
Created1999-03-04
Description

Historically, Pima County has recorded several residential concerns, detailing this area as a reach of wash with severe flooding problems. The purpose of this report is to present the engineering analyses of four alternative remedial flood-control measures.

42326-Thumbnail Image.png
Created1995-08-15
DescriptionA follow-up report that includes a copy of a USGS quadrangle map, an aerial photograph of the drainage basin, and documentation addressing the 1-hour, 100-year rainfall amount.
42515-Thumbnail Image.png
Created2014-03
Description

In fiscal year 2013, the Department paid at least $14.6 million for transportation services for child protective services clients. However, the Department does not use performance measurement to manage and evaluate these services, including overseeing contracted transportation providers. The Department should develop and implement a performance measurement system to evaluate

In fiscal year 2013, the Department paid at least $14.6 million for transportation services for child protective services clients. However, the Department does not use performance measurement to manage and evaluate these services, including overseeing contracted transportation providers. The Department should develop and implement a performance measurement system to evaluate these services and ensure that this system provides the necessary data to evaluate the appropriateness and cost-effectiveness of contracting for these services. In addition, although the Department has implemented some procedures to help ensure proper payments to transportation providers for these services, additional steps would help address internal control deficiencies.

42330-Thumbnail Image.png
Created1987 to 1989
Description

Offsite drainage impacts the project site from several watersheds whose headwaters lie to the northeast of the project site. This report will address the manner in which the existing offsite and the post-development onsite drainage will be conveyed across this project.

42345-Thumbnail Image.png
Created1992-01
Description

This study proposes to reduce flood damages from both Tanque Verde Creek and offsite flows, as they affect the Fortyniner's Country Club Estates and the Arbor Vista subdivisions.

42347-Thumbnail Image.png
Created1990-09-12
Description

The purpose of this report is to assist the Pima County Board of Supervisors in assessing whether the Black Wash area requires area-specific flood control policies.

42349-Thumbnail Image.png
Created1989 to 1991
Description

The purpose of the study is to identify existing flooding problems for fifteen homes adjacent and west of Holladay Street which have experienced flooding in the past three years. A 1991 follow-up report is included that corrects an error in the earlier report's estimation of the split flow quantities at

The purpose of the study is to identify existing flooding problems for fifteen homes adjacent and west of Holladay Street which have experienced flooding in the past three years. A 1991 follow-up report is included that corrects an error in the earlier report's estimation of the split flow quantities at the intersection.

42356-Thumbnail Image.png
Created1988-06-17
Description

Millstone Manor #6 is a subdivision that was recorded in the mid-1950's. All records indicate no engineering took place with regards to potential for drainage improvements. This report will address what the natural floodprone areas are and will recommend how future permits should be processed.

42363-Thumbnail Image.png
Created2009-01-21
Description

Covers an area in southeastern Pima County that drains the Arivaca Creek watershed. The purpose of the report is to estimate peak discharge for the 50 year storm frequency event, utilizing the rational method (Q=CiA). This method pre-dates that outlined in the Hydrology Manual for Engineering Design and Floodplain Management

Covers an area in southeastern Pima County that drains the Arivaca Creek watershed. The purpose of the report is to estimate peak discharge for the 50 year storm frequency event, utilizing the rational method (Q=CiA). This method pre-dates that outlined in the Hydrology Manual for Engineering Design and Floodplain Management within Pima County, Sept. 1979, and is considered less accurate. It is recommended that this report be archived and discontinued for use for regulatory purposes.