Matching Items (7)
Filtering by

Clear all filters

Created2014-06
Description

This Campaign Effectiveness Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2013-2014 Clean Air and Clean Stormwater Program Campaigns. This project analyzed and tracked the overall effectiveness of the Clean Air Program after 24 campaign sessions. For the second

This Campaign Effectiveness Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2013-2014 Clean Air and Clean Stormwater Program Campaigns. This project analyzed and tracked the overall effectiveness of the Clean Air Program after 24 campaign sessions. For the second consecutive year, the survey also measured and tracked attitudes, knowledge, awareness, and behaviors related to stormwater management for the Clean Stormwater Program Campaign.

Created2013-06
Description

This Campaign Effectiveness Travel Behavioral Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2012-2013 Clean Air Campaign, as well as analyze the overall effectiveness of the air quality media campaign after 23 campaign sessions. New to the current study,

This Campaign Effectiveness Travel Behavioral Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2012-2013 Clean Air Campaign, as well as analyze the overall effectiveness of the air quality media campaign after 23 campaign sessions. New to the current study, the survey also measured baseline awareness/knowledge related to storm water and hazardous waste issues.

Created2000 to 2016
Description

The Arizona Department of Transportation was authorized in 1996 to administer a State Infrastructure Bank under a cooperative agreement with the Federal Highway Administration. The Highway Expansion and Extension Loan Program (HELP) was established. The financial statements present only the funds comprising the Fund and are not intended to present

The Arizona Department of Transportation was authorized in 1996 to administer a State Infrastructure Bank under a cooperative agreement with the Federal Highway Administration. The Highway Expansion and Extension Loan Program (HELP) was established. The financial statements present only the funds comprising the Fund and are not intended to present fairly the financial position or results of operations of the Department.

Created1998 to 2017
Description

The HELP program is meant to be a funding tool to accelerate needed highway projects throughout the state. Board Funding Obligations are an important part of the HELP capitalization and the current stress on the State's General Fund has impacted our ability to use BFOs as a funding source for

The HELP program is meant to be a funding tool to accelerate needed highway projects throughout the state. Board Funding Obligations are an important part of the HELP capitalization and the current stress on the State's General Fund has impacted our ability to use BFOs as a funding source for new loans. Though $140 million of BFOs are authorized by statute to capitalize the HELP, the State Treasurer was required to call all outstanding BFOs in April 2009. Consequently, the State Transportation Board and the Department have suspended the HELP program given the uncertainty of a long term funding source.

42003-Thumbnail Image.png
Created2015-09
Description

Projected transportation revenues fall short of estimated needs and the Arizona Legislature should consider a task force to study options for addressing transportation revenue needs.

42726-Thumbnail Image.png
Created2001-02
Description

Conducted for the Pima County Flood Control District by the Pima Association of Governments in order to determine if stormflows on the Cienega Creek have changed over time when analyzed in terms of frequency, volume, and seasonallity. In a data search that extends back to the 1950s, they were able

Conducted for the Pima County Flood Control District by the Pima Association of Governments in order to determine if stormflows on the Cienega Creek have changed over time when analyzed in terms of frequency, volume, and seasonallity. In a data search that extends back to the 1950s, they were able to determine the daily mean flow, the flows over base, and the annual peak flows of the Cienega Creek.

Created2007-10-12
Description

Purpose of this report is to provide a detailed analysis of the runoff characteristics of the Diamond Bell Ranch area.To this end, HEC-HMS models were generated to analyze the runoff under existing watershed conditions.