Matching Items (12)
Filtering by

Clear all filters

42480-Thumbnail Image.png
Created1993-09-17
Description

This document has been prepared to fulfill the requirements for a hydraulic study for the Cave Creek Landfill operated by Maricopa County.

42481-Thumbnail Image.png
Created2005-08-26
Description

During the period of 1965 through 1984, Maricopa County operated a landfill leased from the U.S. Bureau of Land Management. In 1982 the County leased a separate parcel from the State for the development of a new landfill. The landfill stopped accepting waste in 1998.

42482-Thumbnail Image.png
Created2005-07-08
Description

To evaluate whether VOCs are migrating out of the landfills into the vadose zone, a soil vapor survey of the soil beneath the landfill bases was performed. Permanent vapor monitoring probes were installed and then sampled twice for VOCs. Groundwater beneath the landfills has been impactd by VOCs, namely TCE,

To evaluate whether VOCs are migrating out of the landfills into the vadose zone, a soil vapor survey of the soil beneath the landfill bases was performed. Permanent vapor monitoring probes were installed and then sampled twice for VOCs. Groundwater beneath the landfills has been impactd by VOCs, namely TCE, DCE, and toluene.

42483-Thumbnail Image.png
Created2008-01
Description

This monitor well completion report was prepared to document the construction and installation of monitor well MW-3, located on the southeast side of Black Mountain Parkway. It was installed to provide long-term ground-water monitoring.

42484-Thumbnail Image.png
Created2012-11-19
Description

This Additional Site Characterization Work Plan presents a strategy for collecting site characterization information at the closed Maricopa County Cave Creek Landfill to support ongoing remedial action planning for trichloroethene-impacted groundwater underlying the site. The Work Plan supplements previous remedial investigation work plans prepared to characterize the nature and extent

This Additional Site Characterization Work Plan presents a strategy for collecting site characterization information at the closed Maricopa County Cave Creek Landfill to support ongoing remedial action planning for trichloroethene-impacted groundwater underlying the site. The Work Plan supplements previous remedial investigation work plans prepared to characterize the nature and extent of site contamination.

42036-Thumbnail Image.png
Created2009-04
Description

Landscaping planted after January 1, 1987 within publicly owned rights-of-way and irrigated with groundwater may be planted only with plants listed on the ADWR Low Water Use/ Drought Tolerant Plant List for the Tucson AMA. The director may waive this requirement under special circumstances. This list can also be used

Landscaping planted after January 1, 1987 within publicly owned rights-of-way and irrigated with groundwater may be planted only with plants listed on the ADWR Low Water Use/ Drought Tolerant Plant List for the Tucson AMA. The director may waive this requirement under special circumstances. This list can also be used as a resource for residents and businesses that are interested in conserving water. The list provides a wide array of plants to accomplish a variety of low wateruse landscape designs.

43222-Thumbnail Image.png
Created2009-11
Description

This report summarizes the results of an economic impact analysis of the Rosemont Copper Project, an open-pit mining operation to be developed on a 15,000 acre site in Pima County about 30 miles southeast of Tucson. The analysis employed the REMI PI+ regional economic forecasting model to estimate the economic

This report summarizes the results of an economic impact analysis of the Rosemont Copper Project, an open-pit mining operation to be developed on a 15,000 acre site in Pima County about 30 miles southeast of Tucson. The analysis employed the REMI PI+ regional economic forecasting model to estimate the economic impacts of the Project for the Cochise/Pima County/Santa Cruz Counties study area, for the State of Arizona, and for the United States.

Created2000 to 2016
Description

The Arizona Department of Transportation was authorized in 1996 to administer a State Infrastructure Bank under a cooperative agreement with the Federal Highway Administration. The Highway Expansion and Extension Loan Program (HELP) was established. The financial statements present only the funds comprising the Fund and are not intended to present

The Arizona Department of Transportation was authorized in 1996 to administer a State Infrastructure Bank under a cooperative agreement with the Federal Highway Administration. The Highway Expansion and Extension Loan Program (HELP) was established. The financial statements present only the funds comprising the Fund and are not intended to present fairly the financial position or results of operations of the Department.

Created1998 to 2017
Description

The HELP program is meant to be a funding tool to accelerate needed highway projects throughout the state. Board Funding Obligations are an important part of the HELP capitalization and the current stress on the State's General Fund has impacted our ability to use BFOs as a funding source for

The HELP program is meant to be a funding tool to accelerate needed highway projects throughout the state. Board Funding Obligations are an important part of the HELP capitalization and the current stress on the State's General Fund has impacted our ability to use BFOs as a funding source for new loans. Though $140 million of BFOs are authorized by statute to capitalize the HELP, the State Treasurer was required to call all outstanding BFOs in April 2009. Consequently, the State Transportation Board and the Department have suspended the HELP program given the uncertainty of a long term funding source.

Created2010-04-30
Description

This study is to update the current plan entitled "Unified Nogales/Santa Cruz County Transportation 2000 Plan." The local governments need a fresh look and new approach to developing their transportation plan. Purpose: The purpose of this study is to create a useful, workable transportation system planning document that contains a

This study is to update the current plan entitled "Unified Nogales/Santa Cruz County Transportation 2000 Plan." The local governments need a fresh look and new approach to developing their transportation plan. Purpose: The purpose of this study is to create a useful, workable transportation system planning document that contains a realistic and achievable program for implementing transportation system improvements throughout the city and the county.