Filtering by
- All Subjects: Floodplain management
- All Subjects: Hohokam culture
- Creators: Battelle Memorial Institute. Technology Partnership Practice
Phase IIA focuses on identifying alternatives for mitigating the hazards and problems, evaluating the alternatives for flood mitigation potential and cost effectiveness, and recommending a preferred alternative and flood control policy.
This report is one of several from Statistical Research Inc. written to develop the Cultural and Historic Resources Element of the Sonoran Desert Conservation Plan. Divided into four parts, the report summarizes available information that reflects the experience of (1) ancient peoples of Southern Arizona; (2) indigenous peoples; (3) non-indigenous peoples of the historical period; and (4) Pima County today.
This completes the series of reports by Statistical Research, Inc. A discussion of the period of Hohokam culture between 800 and 1200 A.D. is divided into four sections that review the domestic landscape, the agricultural landscape, the religious landscape, and the social landscape of the people.
This study covers the time period after 1200 A.D. in terms of the domestic landscape, the agricultural landscape, and the social landscape as the residents of southern Arizona adjust to upheaval and change in environmental and social conditions. This memorandum summarizes the study about the Classic Period and provides a comparison of findings and theories about area residents from both before and after 1200 A.D., which is the approximate time frame of the collapse and restructuring of cultural landscapes.
The purpose of this study, which represents Phase I, is to determine long range planning and land use policies for flood control and floodplain management in the southwest area.
The purpose of this report is to assist the Pima County Board of Supervisors in assessing whether the Black Wash area requires area-specific flood control policies.
The purpose of this study is to revise the existing Flood Insurance Study and Flood Insurance Rate Maps for a portion of the Canada del Oro Wash. This information will be used by Pima County to update existing flood plain information.
The study developed the 100-year floodplain limits within the watershed and identified the area between Westover Avenue and Valencia Road as a major flood hazard area affecting most of the properties along the channel.
This plan has focused on two program areas: 1) floodplain management through revised floodplain delineations and assessment of subsequent FEMA mapping revisions; and 2) basin-wide planning issues involving both short- and long-term drainage infrastructure and regulatory needs.
Offsite drainage impacts the project site from several watersheds whose headwaters lie to the northeast of the project site. This report will address the manner in which the existing offsite and the post-development onsite drainage will be conveyed across this project.