Matching Items (25)
Filtering by

Clear all filters

Created1994-04-29
Description

Phase IIA focuses on identifying alternatives for mitigating the hazards and problems, evaluating the alternatives for flood mitigation potential and cost effectiveness, and recommending a preferred alternative and flood control policy.

43571-Thumbnail Image.png
Created2008-10
Description

A landmark assessment of infrastructure needs in Arizona was produced by the L. William Seidman Research Institute in May 2008 for the Arizona Investment Council (AIC): "Infrastructure Needs and Funding Alternatives for Arizona: 2008-2032", that addressed infrastructure needs in four categories: energy, telecommunications, transportation, and water and wastewater. The information

A landmark assessment of infrastructure needs in Arizona was produced by the L. William Seidman Research Institute in May 2008 for the Arizona Investment Council (AIC): "Infrastructure Needs and Funding Alternatives for Arizona: 2008-2032", that addressed infrastructure needs in four categories: energy, telecommunications, transportation, and water and wastewater. The information from the AIC report is a major input to the report that follows. Other types of infrastructure — most notably education, health care, and public safety — also are analyzed here to provide a more complete picture of infrastructure needs in Arizona. The goals of this report are to place Arizona’s infrastructure needs into national and historical contexts, to identify the changing conditions in infrastructure provision that make building Arizona’s infrastructure in the future a more problematic proposition than in the past, and to provide projections of the possible costs of providing infrastructure in Arizona over the next quarter century.

41938-Thumbnail Image.png
Created2014-01
Description

A community assessment of Tempe by its Police and Fire Departments, to identify significant trends in population demographics and economic development, as well as growth of Arizona State University. These trends are analyzed so that more informed decisions on public safety staffing needs can be made.

41937-Thumbnail Image.png
Created2015-02
Description

An update to the January 2014 community assessment of Tempe by its Police and Fire Departments, reviewing current and planned developments in Tempe and on the ASU Tempe campus that affect public safety needs and response.

Created1990-07
Description

The purpose of this study, which represents Phase I, is to determine long range planning and land use policies for flood control and floodplain management in the southwest area.

42347-Thumbnail Image.png
Created1990-09-12
Description

The purpose of this report is to assist the Pima County Board of Supervisors in assessing whether the Black Wash area requires area-specific flood control policies.

42346-Thumbnail Image.png
Created1994-10
Description

The purpose of this study is to revise the existing Flood Insurance Study and Flood Insurance Rate Maps for a portion of the Canada del Oro Wash. This information will be used by Pima County to update existing flood plain information.

42343-Thumbnail Image.png
Created1992-09
Description

The study developed the 100-year floodplain limits within the watershed and identified the area between Westover Avenue and Valencia Road as a major flood hazard area affecting most of the properties along the channel.

42339-Thumbnail Image.png
Created1993-08-03
Description

This plan has focused on two program areas: 1) floodplain management through revised floodplain delineations and assessment of subsequent FEMA mapping revisions; and 2) basin-wide planning issues involving both short- and long-term drainage infrastructure and regulatory needs.

42330-Thumbnail Image.png
Created1987 to 1989
Description

Offsite drainage impacts the project site from several watersheds whose headwaters lie to the northeast of the project site. This report will address the manner in which the existing offsite and the post-development onsite drainage will be conveyed across this project.