Matching Items (10)
Filtering by

Clear all filters

Created2010-06
Description

The La Paz Transportation Planning Study was conducted as part of the Planning Assistance for Rural Areas program sponsored by the Arizona Department of Transportation Multimodal Planning Division. This Study developed 5, 10, and 20-year transportation plans, as well as an implementation program, to guide the County, Towns, and the

The La Paz Transportation Planning Study was conducted as part of the Planning Assistance for Rural Areas program sponsored by the Arizona Department of Transportation Multimodal Planning Division. This Study developed 5, 10, and 20-year transportation plans, as well as an implementation program, to guide the County, Towns, and the Colorado River Indian Tribes in meeting transportation needs for the Study Area into the future.

Created2011-02
Description

ADOT, in cooperation with the City of Kingman and Mohave County, initiated the Kingman Area Transportation Study Update to update the 2005 Kingman Area Transportation Study. The study provides a plan of improvements for 5-year (short-range), 10-year (mid-range), and 20-year (long-range) transportation planning horizons. The recommendations are multimodal, considering roadways,

ADOT, in cooperation with the City of Kingman and Mohave County, initiated the Kingman Area Transportation Study Update to update the 2005 Kingman Area Transportation Study. The study provides a plan of improvements for 5-year (short-range), 10-year (mid-range), and 20-year (long-range) transportation planning horizons. The recommendations are multimodal, considering roadways, nonmotorized transportation modes (bicycles and pedestrians), and transit components.

Created2010-09
Description

Pavements represent one of the largest capital investments in Arizona’s aviation system. Timely airport pavement maintenance and rehabilitation are crucial because repairs are much more costly once the condition deteriorates below a certain level. Additionally, airport pavement weaknesses, such as cracks and loose debris, pose a significant safety risk to

Pavements represent one of the largest capital investments in Arizona’s aviation system. Timely airport pavement maintenance and rehabilitation are crucial because repairs are much more costly once the condition deteriorates below a certain level. Additionally, airport pavement weaknesses, such as cracks and loose debris, pose a significant safety risk to aircraft.

43015-Thumbnail Image.png
Created1997-12
Description

The Cochise County Airport is playing an increasing role in the promotion and development of the City of Willcox and the Cochise County area. The master plan has a capital improvement program that responds to the needs and desires for the short and long term aviation forecasts for Cochise County.

42925-Thumbnail Image.png
Created2013-09
Description

In fiscal year 2011, Kingman Unified School District’s student achievement was similar to peer district averages, and it operated efficiently with lower costs than peer districts’, on average. The District operated its administration with lower per pupil costs because it employed fewer administrative staff per pupil than peer districts, on

In fiscal year 2011, Kingman Unified School District’s student achievement was similar to peer district averages, and it operated efficiently with lower costs than peer districts’, on average. The District operated its administration with lower per pupil costs because it employed fewer administrative staff per pupil than peer districts, on average. In addition, the District’s plant operations cost per square foot and food service cost per meal were lower than peer districts’ averages. The District’s transportation program cost per pupil was higher than the peer districts’ average, but the program was efficient, with lower per mile costs. However, the District should improve some of its administrative practices. In particular, the District should strengthen controls over its cash handling, culinary arts program, and computer network and systems.

42917-Thumbnail Image.png
Created1998-11-05
Description

The Chandler Airpark area encompasses nine square miles surrounding the Chandler Municipal Airport. The area plan provides the City of Chandler with a document that will strategically guide future development in and around the existing airport. The two major goals of this plan are the protection of the Municipal Airport

The Chandler Airpark area encompasses nine square miles surrounding the Chandler Municipal Airport. The area plan provides the City of Chandler with a document that will strategically guide future development in and around the existing airport. The two major goals of this plan are the protection of the Municipal Airport from residential encroachment and the aggressive economic development of the Airpark area.

41933-Thumbnail Image.png
Created2009
Description

An evaluation of Glendale Municipal Airport's capabilities and role, forecast for future aviation demand, and a plan for facilities to meet that demand.

41921-Thumbnail Image.png
Created2010-04
Description

An update to the 1998 Chandler Municipal Airport master plan to make it meet current Federal Aviation Administration and Arizona Department of Transportation requirements as well as anticipated needs of Chandler residents and businesses.

42391-Thumbnail Image.png
Created2007-04-30
Description

Grace Neal Parkway and Bank Street are located in the northern Kingman area partially outside of the Kingman city limits. This report discusses of creating a new arterial roadway providing safety and convenience for vehicular traffic and pedestrians. Although Grace Neal is referred to as a parkway, its designation for

Grace Neal Parkway and Bank Street are located in the northern Kingman area partially outside of the Kingman city limits. This report discusses of creating a new arterial roadway providing safety and convenience for vehicular traffic and pedestrians. Although Grace Neal is referred to as a parkway, its designation for design is arterial.

42273-Thumbnail Image.png
Created2010-08
Description

This update of the Eric Marcus Municipal Airport Master Plan has been undertaken to evaluate the airport’s capabilities and role, to review forecasts of future aviation demand, and to plan for the timely development of new or expanded facilities that may be required to meet that demand. The ultimate goal

This update of the Eric Marcus Municipal Airport Master Plan has been undertaken to evaluate the airport’s capabilities and role, to review forecasts of future aviation demand, and to plan for the timely development of new or expanded facilities that may be required to meet that demand. The ultimate goal of the master plan is to provide systematic guidelines for the airport’s overall development, operation, and ownership.