Filtering by
- All Subjects: Flood control
- All Subjects: Land use--Planning
- Creators: Battelle Memorial Institute. Technology Partnership Practice
- Resource Type: Text
This Land Use Survey, conducted for the Cochise County Planning Department, was designed to elicit citizen opinions about the future pattern of growth in Cochise County and land use issues in areas outside of City limits. This project is an initial step in the County’s "Envision 2020: Land Use Planning in Cochise County" process, developed to measure citizen opinions on how growth is currently managed in the County and how to manage future growth.
The Flagstaff Regional Plan 2030: Place Matters (Regional Plan) updated the Flagstaff Area Regional Land Use and Transportation Plan (2001). The vision and goals for the Regional Plan are directed toward creating a cohesive and sustainable land use and development pattern resulting in a contextsensitive and efficient transportation system that supports economic development, multimodal transportation, and improved safety and accessibility.
A statement of the community vision for the 525-square-mile Flagstaff Metropolitan Planning Organization (FMPO) area, which extends west-to-east from Bellemont to Winona, and south-to-north from Kachina Village/Mountainaire to north of the San Francisco Peaks. It is the general plan for the City of Flagstaff, and in county areas, works in conjunction with the Coconino County Comprehensive Plan.
The purpose of the Flood Response Plan is to reduce the potential for property damage and loss of life resulting from floods on the Beaver Dam Wash at the community of Beaver Dam. This report is intentionally short and concise to make it easily usable during a flood emergency.
The Flecha Caida study area encompasses approximately eight square miles of the foothill region of the Santa Catalina Mountains. The three major washes studied include Finger Rock Wash, Valley View Wash, and Flecha Caida Wash. One tributary (Sky Club Wash) to the Valley View Wash and three tributaries to the Finger Rock Wash were also included in this study.
This report is the first phase of a study to provide a basin management plan for the Tucson Mountain Drainage Basin. Phase II will identify and evaluate alternative specific solutions to flood plain management measures with Phase III accomplishing conceptual designs for the selected alternatives.
The purpose of this study is to develop a basin management plan for Highlands Wash and the two washes west of Highlands Wash.
The purpose of Phase I of the Riverside Terrace Basin management plan is the assessment of the existing hydrologic and basic hydraulic properties of the watershed.
This report is being submitted for the purpose of reducing the erosion setback limits. The information contained herein supports the claim that a safe reduction in the setback distance can occur.
Millstone Manor #6 is a subdivision that was recorded in the mid-1950's. All records indicate no engineering took place with regards to potential for drainage improvements. This report will address what the natural floodprone areas are and will recommend how future permits should be processed.