Filtering by
- All Subjects: Transportation--Planning
- All Subjects: Floodplain management
- Language: English
- Resource Type: Text
A long-range plan for travel and mobility in Gilbert, Arizona, designed to implement the 2011 Town General Plan's vision to provide mobility and access in a way that is safe and convenient, while minimizing congestion, air pollution and noise.
A statement of the community vision for the 525-square-mile Flagstaff Metropolitan Planning Organization (FMPO) area, which extends west-to-east from Bellemont to Winona, and south-to-north from Kachina Village/Mountainaire to north of the San Francisco Peaks. It is the general plan for the City of Flagstaff, and in county areas, works in conjunction with the Coconino County Comprehensive Plan.
The focus of this sub-regional study is the roadway system in an area of southern Navajo and Apache Counties bounded by the Town of Pinetop-Lakeside in the south, the Town of Snowflake in the north, Pulp Mill Road to the west, and the Concho area in Apache County to the east.
The purpose of this study, which represents Phase I, is to determine long range planning and land use policies for flood control and floodplain management in the southwest area.
The purpose of this report is to assist the Pima County Board of Supervisors in assessing whether the Black Wash area requires area-specific flood control policies.
The purpose of this study is to revise the existing Flood Insurance Study and Flood Insurance Rate Maps for a portion of the Canada del Oro Wash. This information will be used by Pima County to update existing flood plain information.
The study developed the 100-year floodplain limits within the watershed and identified the area between Westover Avenue and Valencia Road as a major flood hazard area affecting most of the properties along the channel.
This plan has focused on two program areas: 1) floodplain management through revised floodplain delineations and assessment of subsequent FEMA mapping revisions; and 2) basin-wide planning issues involving both short- and long-term drainage infrastructure and regulatory needs.
Offsite drainage impacts the project site from several watersheds whose headwaters lie to the northeast of the project site. This report will address the manner in which the existing offsite and the post-development onsite drainage will be conveyed across this project.
This request for a Physical Map Revision is for a reach of Camino de Oeste Wash from Foret Road to Camino De Oeste Road. This PMR is to reflect improved topographical data available subsequent to the Flood Insurance Study of this area, and to establish base flood elevations for the floodplain.