Matching Items (914)
Filtering by

Clear all filters

Created2005-05-02
Description

The La Paz County Comprehensive Plan is the first overall plan for development countywide. Due to the passage of new state requirements and a desire to plan for the future, the La Paz County Board of Supervisors contracted with Partners for Strategic Action, Inc. to develop the county’s first comprehensive

The La Paz County Comprehensive Plan is the first overall plan for development countywide. Due to the passage of new state requirements and a desire to plan for the future, the La Paz County Board of Supervisors contracted with Partners for Strategic Action, Inc. to develop the county’s first comprehensive plan. The consulting team was directed to solicit broad community participation, study the county planning area, and develop a plan that would be an easy-to-understand policy document that will guide La Paz County’s development in the future.

42905-Thumbnail Image.png
ContributorsGreenlee County (Ariz.) (Author)
Created2003-03-04
Description

The purpose of the plan is to bring about coordinated physical development in accordance with the present and future needs of the county. The comprehensive plan shall be developed so as to conserve the natural resources of the county, to insure efficient expenditure of public funds, and to promote the

The purpose of the plan is to bring about coordinated physical development in accordance with the present and future needs of the county. The comprehensive plan shall be developed so as to conserve the natural resources of the county, to insure efficient expenditure of public funds, and to promote the health, safety, convenience, and general welfare of the public. Such comprehensive plan may include but not be limited to, among other things, studies and recommendations relative to the location, character and extent of highways, railroads, bus and other transportation routes, bicycle facilities, bridges, public buildings, public services, schools, parks, open space, housing quality, variety and affordability, parkways, hiking and riding trails, airports, forests, wildlife areas, dams, projects affecting conservation of natural resources, air quality, water quality and floodplain zoning.

42909-Thumbnail Image.png
Created1995-07-13
Description

The Chandler Redevelopment Element is an element of the Chandler General Plan and updates the city's 1987 Redevelopment Plan with more emphasis placed on defining the implementation measures.

42911-Thumbnail Image.png
Created2006-10-20
Description

The South Arizona Avenue Entry Corridor Study is prompted by a Mayor and Council goal for redeveloping the section of Arizona Avenue from Pecos Road to Boston Street as a new entryway to downtown from the Santan/Loop 202 Freeway. The plan was created with extensive neighborhood participation,which included six neighborhood

The South Arizona Avenue Entry Corridor Study is prompted by a Mayor and Council goal for redeveloping the section of Arizona Avenue from Pecos Road to Boston Street as a new entryway to downtown from the Santan/Loop 202 Freeway. The plan was created with extensive neighborhood participation,which included six neighborhood meetings and individual meetings with property owners.The comprehensive approach to this study can be broken down into four primary areas: Land Use,Traffic Circulation, Conceptual Design Standards, and Neighborhood Planning.

ContributorsChandler (Ariz.) (Publisher)
Created1999-09-16
Description

The Southeast Chandler Area Plan seeks to pay respect to the sense of place and history embedded in Southeast Chandler while simultaneously; a) supporting the diversity of lifestyles and development preferences of existing and future residents; b) nurturing true community building and stewardship over the unique attributes of the area;

The Southeast Chandler Area Plan seeks to pay respect to the sense of place and history embedded in Southeast Chandler while simultaneously; a) supporting the diversity of lifestyles and development preferences of existing and future residents; b) nurturing true community building and stewardship over the unique attributes of the area; and, c) fostering quality development based on sound planning principles and meaningful public involvement.

42913-Thumbnail Image.png
ContributorsChandler (Ariz.) (Publisher)
Created2008-06
Description

The updated Chandler General Plan presents instructional guidance for coping with the consequences of approaching build-out. This document is not meant to be read from cover-to-cover in a single sitting. However, a user, whether a citizen appearing at a public hearing for the first time or a long-term City official,

The updated Chandler General Plan presents instructional guidance for coping with the consequences of approaching build-out. This document is not meant to be read from cover-to-cover in a single sitting. However, a user, whether a citizen appearing at a public hearing for the first time or a long-term City official, should become familiar with the Plan's content. A comprehensive planning view encourages the General Plan user to evaluate change on a Citywide basis, directing progress for the good of the community rather than special interests.

42407-Thumbnail Image.png
Created2009-06-23
Description

The purpose of the U.S. Highway 93 Corridor Area Plan is to recognize the unique character of the highway corridor and to encourage land use patterns that are consistent with the goals of the Mohave County General Plan, the residents and the property owners. The U.S. Highway 93 Corridor Area

The purpose of the U.S. Highway 93 Corridor Area Plan is to recognize the unique character of the highway corridor and to encourage land use patterns that are consistent with the goals of the Mohave County General Plan, the residents and the property owners. The U.S. Highway 93 Corridor Area Plan, a component of the General Plan, covers approximately 430 square miles of unincorporated land in Mohave County.

42408-Thumbnail Image.png
Created2007-02-08
Description

The purpose of the Long Mountain Area Plan is to recognize the unique character of the Long Mountain Area and to encourage land use patterns that are consistent with the goals of the Mohave County General Plan. The Long Mountain Area Plan, a component of the General Plan, covers approximately

The purpose of the Long Mountain Area Plan is to recognize the unique character of the Long Mountain Area and to encourage land use patterns that are consistent with the goals of the Mohave County General Plan. The Long Mountain Area Plan, a component of the General Plan, covers approximately 61 square miles of unincorporated land in Mohave County.

42409-Thumbnail Image.png
Created2003-12-15
Description

In 1995, Mohave County adopted the “Mohave County General Plan” which included a countywide land use design. Included were several surrounding small communities. These communities subsequently created their own more specific area plans which were then included in the Mohave County General Plan. However, Dolan Springs was identified as an

In 1995, Mohave County adopted the “Mohave County General Plan” which included a countywide land use design. Included were several surrounding small communities. These communities subsequently created their own more specific area plans which were then included in the Mohave County General Plan. However, Dolan Springs was identified as an “outlying community” which would not be included. Dolan Springs then created their own area plan.

42410-Thumbnail Image.png
Created2009-06
Description

It was decided to revise the 1980 Havasu area study, since the area had changed so much. The members felt that to retain some control over the growth a revised area plan was needed and decided to have the area covered to be just the 72 square miles of the

It was decided to revise the 1980 Havasu area study, since the area had changed so much. The members felt that to retain some control over the growth a revised area plan was needed and decided to have the area covered to be just the 72 square miles of the Desert Hills Fire District, rather than the whole of the unincorporated Lake Havasu Area north of the City.