Matching Items (800)
Filtering by

Clear all filters

42905-Thumbnail Image.png
ContributorsGreenlee County (Ariz.) (Author)
Created2003-03-04
Description

The purpose of the plan is to bring about coordinated physical development in accordance with the present and future needs of the county. The comprehensive plan shall be developed so as to conserve the natural resources of the county, to insure efficient expenditure of public funds, and to promote the

The purpose of the plan is to bring about coordinated physical development in accordance with the present and future needs of the county. The comprehensive plan shall be developed so as to conserve the natural resources of the county, to insure efficient expenditure of public funds, and to promote the health, safety, convenience, and general welfare of the public. Such comprehensive plan may include but not be limited to, among other things, studies and recommendations relative to the location, character and extent of highways, railroads, bus and other transportation routes, bicycle facilities, bridges, public buildings, public services, schools, parks, open space, housing quality, variety and affordability, parkways, hiking and riding trails, airports, forests, wildlife areas, dams, projects affecting conservation of natural resources, air quality, water quality and floodplain zoning.

42909-Thumbnail Image.png
Created1995-07-13
Description

The Chandler Redevelopment Element is an element of the Chandler General Plan and updates the city's 1987 Redevelopment Plan with more emphasis placed on defining the implementation measures.

42911-Thumbnail Image.png
Created2006-10-20
Description

The South Arizona Avenue Entry Corridor Study is prompted by a Mayor and Council goal for redeveloping the section of Arizona Avenue from Pecos Road to Boston Street as a new entryway to downtown from the Santan/Loop 202 Freeway. The plan was created with extensive neighborhood participation,which included six neighborhood

The South Arizona Avenue Entry Corridor Study is prompted by a Mayor and Council goal for redeveloping the section of Arizona Avenue from Pecos Road to Boston Street as a new entryway to downtown from the Santan/Loop 202 Freeway. The plan was created with extensive neighborhood participation,which included six neighborhood meetings and individual meetings with property owners.The comprehensive approach to this study can be broken down into four primary areas: Land Use,Traffic Circulation, Conceptual Design Standards, and Neighborhood Planning.

42913-Thumbnail Image.png
ContributorsChandler (Ariz.) (Publisher)
Created2008-06
Description

The updated Chandler General Plan presents instructional guidance for coping with the consequences of approaching build-out. This document is not meant to be read from cover-to-cover in a single sitting. However, a user, whether a citizen appearing at a public hearing for the first time or a long-term City official,

The updated Chandler General Plan presents instructional guidance for coping with the consequences of approaching build-out. This document is not meant to be read from cover-to-cover in a single sitting. However, a user, whether a citizen appearing at a public hearing for the first time or a long-term City official, should become familiar with the Plan's content. A comprehensive planning view encourages the General Plan user to evaluate change on a Citywide basis, directing progress for the good of the community rather than special interests.

42400-Thumbnail Image.png
ContributorsArizona. Governor's Drought Task Force (Contributor)
Created2007-12-06
Description

This study is intended to assess flood risk, and identify flood hazards based on those risks, for the Beaver Dam area from the Beaver Dam Wash. The hydrologic and hydraulic results are intended for risk assessment and emergency management purposes only. The results of this study should not be considered

This study is intended to assess flood risk, and identify flood hazards based on those risks, for the Beaver Dam area from the Beaver Dam Wash. The hydrologic and hydraulic results are intended for risk assessment and emergency management purposes only. The results of this study should not be considered as “best available technical information” for floodplain management purposes.”

42401-Thumbnail Image.png
Created2009-01-11
Description

The purpose of the Flood Response Plan is to reduce the potential for property damage and loss of life resulting from floods on the Beaver Dam Wash at the community of Beaver Dam. This report is intentionally short and concise to make it easily usable during a flood emergency.

42407-Thumbnail Image.png
Created2009-06-23
Description

The purpose of the U.S. Highway 93 Corridor Area Plan is to recognize the unique character of the highway corridor and to encourage land use patterns that are consistent with the goals of the Mohave County General Plan, the residents and the property owners. The U.S. Highway 93 Corridor Area

The purpose of the U.S. Highway 93 Corridor Area Plan is to recognize the unique character of the highway corridor and to encourage land use patterns that are consistent with the goals of the Mohave County General Plan, the residents and the property owners. The U.S. Highway 93 Corridor Area Plan, a component of the General Plan, covers approximately 430 square miles of unincorporated land in Mohave County.

42408-Thumbnail Image.png
Created2007-02-08
Description

The purpose of the Long Mountain Area Plan is to recognize the unique character of the Long Mountain Area and to encourage land use patterns that are consistent with the goals of the Mohave County General Plan. The Long Mountain Area Plan, a component of the General Plan, covers approximately

The purpose of the Long Mountain Area Plan is to recognize the unique character of the Long Mountain Area and to encourage land use patterns that are consistent with the goals of the Mohave County General Plan. The Long Mountain Area Plan, a component of the General Plan, covers approximately 61 square miles of unincorporated land in Mohave County.

42409-Thumbnail Image.png
Created2003-12-15
Description

In 1995, Mohave County adopted the “Mohave County General Plan” which included a countywide land use design. Included were several surrounding small communities. These communities subsequently created their own more specific area plans which were then included in the Mohave County General Plan. However, Dolan Springs was identified as an

In 1995, Mohave County adopted the “Mohave County General Plan” which included a countywide land use design. Included were several surrounding small communities. These communities subsequently created their own more specific area plans which were then included in the Mohave County General Plan. However, Dolan Springs was identified as an “outlying community” which would not be included. Dolan Springs then created their own area plan.

42410-Thumbnail Image.png
Created2009-06
Description

It was decided to revise the 1980 Havasu area study, since the area had changed so much. The members felt that to retain some control over the growth a revised area plan was needed and decided to have the area covered to be just the 72 square miles of the

It was decided to revise the 1980 Havasu area study, since the area had changed so much. The members felt that to retain some control over the growth a revised area plan was needed and decided to have the area covered to be just the 72 square miles of the Desert Hills Fire District, rather than the whole of the unincorporated Lake Havasu Area north of the City.